A welding procedure specification (WPS) is the written method for making a welded joint, setting variables such as process, material, thickness range and position. A test weld qualifies it, and the PQR (ASME) or WPQR (ISO) records that test. In South Africa, ask for both before welding on pressure equipment or code-built steelwork, and check their ranges cover your joints.

Headcore9 min read10 sources

What is a welding procedure specification?

A welding procedure specification (WPS) is the written method for making a welded joint. TWI, the UK welding research and technology organisation, describes it as the document that "details the welding variables to be used to ensure a welded joint will achieve the specified levels of weld quality and mechanical properties".[7]

In South Africa, SANS 15609-1:2007, the adoption of ISO 15609-1, sets what a welding procedure specification for arc welding must contain. It replaced SANS 9956-2 of 1995, a number older procedure documents may still carry.[2]

A WPS is qualified before production welding. SANS 15614-1:2007, the adoption of ISO 15614-1, specifies how a preliminary welding procedure specification (pWPS) is qualified by welding procedure tests, for arc and gas welding of steels and arc welding of nickel and nickel alloys. It replaced SANS 9956-3 of 1995.[3]

The record of the test weld, with how it was made and its NDT and mechanical test results, is what proves the WPS. ASME calls it the PQR, and ISO 15607, the ISO general rules for welding procedures, calls it the WPQR.[7][8]

A WPS covers the method, not the welder. Each welder who welds to it needs a qualification of their own, called a code in South Africa: see coded welders.[7]

WPS, pWPS, PQR and WPQR: which document is which?

Four documents go together on qualified welding. The first three belong to the fabricator's procedure; the fourth belongs to each welder.[7][3]

WPS, pWPS, PQR and WPQR: which document is which?
DocumentWhat it isWho prepares itWhat a buyer checks
pWPS (preliminary WPS)The draft method the test piece is welded toThe manufacturer or contractorThat it describes the joint that needs qualifying
PQR (ASME) or WPQR (ISO)The record of the test weld: how it was welded, and its NDT and mechanical test resultsThe manufacturer, with the record approved by an examiner or examining body on the ISO routeThe test reports and who approved them
WPSThe qualified method the welder follows in production, within the ranges the test qualifiedThe manufacturer or contractor, from the PQR or WPQRThe PQR or WPQR it rests on, and ranges that cover your material, thickness and positions
Welder qualification (code)Proof that a named welder can weld within set rangesTested and certified per welderOne certificate per welder named for the job

Sources:[7][8][3][2][5]

When does a buyer need a WPS in South Africa?

Mainly on two kinds of work: pressure equipment, and steelwork built to a welding code. On pressure equipment, a weld repair is a repair in law: the Pressure Equipment Regulations, 2009 define a repair as "restoration to original standard by the application of heat or welding to any pressure equipment" (regulation 1), and they apply to equipment with a design pressure of 50 kPa or more (regulation 2(1)).[1][6]

The user of the equipment has duties of its own when it orders a repair: to give the repairer or modifier "comprehensive information of the operating or intended operating conditions of the pressure equipment, including the characteristics of the fluid and operating parameters of other connected pressure equipment, where reasonably practicable" (regulation 6(2)(a)).[1]

The user must also ensure that the equipment has a certificate from the repairer or modifier, with an approved inspection authority's signature when required, certifying the work was done to the relevant health and safety standard (regulation 6(2)(c)).[1]

For an item built to a section of the ASME Boiler and Pressure Vessel Code (BPVC), the welding procedures are qualified to BPVC Section IX, which ASME describes as containing "rules relating to the qualification of welding, brazing, and fusing procedures as required by other BPVC sections".[5]

For structural steelwork, SANS 2001-CS1:2017 covers steelwork for buildings and other structures, excluding bridges, offshore structures, mobile equipment such as cranes, mine shaft steelwork and mining conveyances. Its text is sold, not published free: ask the project's engineer which welding standard and procedure qualification the specification calls for.[4]

Where a specification calls up AWS D1.1, the Structural Welding Code: Steel, that code covers the welding requirements for any type of welded structure made from the commonly used carbon and low-alloy constructional steels.[6]

How is a welding procedure qualified?

Usually by a procedure test. TWI describes the ISO 15614 route like this: the manufacturer drafts a pWPS; one of its competent welders welds a test piece to it; the test piece is examined and tested and the results recorded; and if the examiner approves the record, it is used to finalise one or more WPSs for production.[7]

The test piece goes through non-destructive and destructive tests. In South Africa, SAIW's materials laboratory offers weld procedure qualification testing. Its SANAS accreditation to ISO 17025 covers the tensile, bend, impact, hardness, macro and fracture tests; the radiographic, magnetic particle, penetrant and visual testing it also lists is not accredited.[10]

Which tests a given procedure needs, and the ranges it then qualifies, are set by the qualification standard and by the application standard or contract. Those texts are sold, not published free, so ask the fabricator which standard and edition its test followed.[7][3]

A procedure test is not the only route. TWI notes that, where the application standard or contract allows, a WPS can be qualified on previous welding experience (ISO 15611), tested welding consumables (ISO 15610) or a standard welding procedure (ISO 15612), and that AWS D1.1 allows prequalified procedures within the limits the code sets.[7][8]

How do I check a WPS against my job?

Compare its qualified ranges with your joints, before the first production weld. A WPS holds only within the ranges its test qualified: a change in an essential variable, which TWI lists as including material type, welding process, thickness range and sometimes welding position, invalidates the procedure and needs a new test.[7]

Compare these points on each WPS with the job:[7]

  • the standard and edition it was qualified to, against the one your contract or construction code names;[7][3]
  • the PQR or WPQR it rests on, with that record's test reports and approval;[7]
  • the welding process, material type and thickness range, against your drawings;[7]
  • the welding positions, against where the welds sit on site;[7]
  • the filler material, heat input and any post-weld heat treatment, against the specification;[9]
  • the welders named for the job, each coded within the WPS's ranges.[7]

What does welding procedure qualification cost in South Africa?

SAIW's technical services price list, last updated in December 2025, gives these lines under the heading "Welding Procedure Specifications": R19,144 for an ISO 15614-1 butt weld, R18,471 for an ASME IX or AWS D1.1 butt weld and R13,865 for a fillet weld under any standard. The page does not say what each price covers or whether VAT is included.[9]

SAIW's laboratory price list, also updated in December 2025 and exclusive of VAT, prices the tests one by one: for example R723 for a tensile test on a specimen under 25 mm thick, R416 for a bend test on a specimen under 10 mm thick, R832 for a set of three impact tests at room temperature, R832 for a weld hardness traverse and R653 for a macro examination with photograph.[10]

Impact tests cost more at lower temperatures: on the same December 2025 list, exclusive of VAT, a set of three is R1,037 at 0°C or below but above -100°C, and R1,441 below -100°C, so state any impact test temperature the design calls for in the request.[10]

A new test is needed where none of the fabricator's qualified WPSs covers the job, so ask which of its existing WPSs it will use.[7]

What to put in your request

  • The code the work is built to (an ASME code for a pressure vessel, SANS 2001-CS1 or AWS D1.1 for structural steel) and the procedure qualification standard you expect, ISO 15614-1 (SANS 15614-1) or ASME IX, with its edition.[5][4][6][3]
  • The joints: parent material grade, wall thickness, pipe diameter, joint type and the welding positions on site, so the fabricator can match them to its WPS ranges.[7]
  • Any filler material, preheat, post-weld heat treatment and impact test temperature the specification sets.[9][10]
  • The WPS for each joint type before work starts, each naming the PQR or WPQR it rests on.[7]
  • A copy of each PQR or WPQR with its NDT and mechanical test reports and the examiner's approval.[7][10]
  • Who is to witness any new procedure test: your own inspector, an inspection body you choose or, on a pressure vessel repair, the approved inspection authority that will countersign the repair certificate where applicable.[1][9]
  • For pressure equipment: the operating conditions, the fluid and the connected equipment, which the user must give the repairer (Pressure Equipment Regulations, regulation 6(2)(a)).[1]
  • Any new procedure test priced as a separate line from the welding.[9]

Questions buyers ask

Is a WPS the same as a welder's code?

No. A WPS is the qualified method for a type of joint; a code is one welder's qualification to weld within set ranges. TWI notes that the welder who welds a satisfactory procedure test piece is also approved, within the range the relevant welder standard gives. See coded welders.[7]

Can a contractor use a WPS that another company qualified?

That depends on the contract and the codes it names, TWI says. Two ISO methods let another organisation do the qualifying: tested welding consumables (ISO 15610) and a standard welding procedure (ISO 15612). AWS D1.1 allows prequalified WPSs within its limits. Ask which route the WPS used, and for the record behind it.[8]

Does every new job need a new procedure test?

No. A qualified WPS can be used again on a job within its ranges. A change in an essential variable, such as material type, welding process or thickness range, needs a new qualification test.[7]

Which records should a pressure vessel owner keep after a weld repair?

The repairer must issue a certificate describing the extent of the repair, countersigned by the approved inspection authority where applicable (regulation 13(1)(b)), and the user must keep a record, open to an inspector, in which the results of all repairs are recorded (regulation 14(1)). In practice, file the WPS, the PQR or WPQR and the welders' certificates with it.[1][7]

Sources

  1. Department of Labour (Government Gazette 32395), Pressure Equipment Regulations, 2009 (GN R.734), the Department's own copy, 15 July 2009, in force 1 October 2009.
  2. SABS Standards Division, SANS 15609-1:2007 (Ed. 1.00), Specification and qualification of welding procedures for metallic materials: Welding procedure specification, Part 1: Arc welding, 26 April 2007, reaffirmed 8 December 2017.
  3. SABS Standards Division, SANS 15614-1:2007 (Ed. 1.00), Specification and qualification of welding procedures for metallic materials: Welding procedure test, Part 1: Arc and gas welding of steels and arc welding of nickel and nickel alloys, 26 April 2007, reaffirmed 23 February 2018.
  4. SABS Standards Division, SANS 2001-CS1:2017 (Ed. 1.02), Construction works, Part CS1: Structural steelwork, 20 December 2017.
  5. ASME, BPVC Section IX: Welding, Brazing, and Fusing Qualifications (2025 edition), 2025.
  6. American Welding Society (AWS), D1.1/D1.1M:2025-AMD1, Structural Welding Code: Steel, 2025.
  7. TWI, Job Knowledge 39: Welding procedure, undated, read November 2026.
  8. TWI, FAQ: Can one company use welding procedures qualified by another company?, undated, read November 2026.
  9. Southern African Institute of Welding (SAIW), Technical Services, with the technical services price list, December 2025.