Grader hire and roller hire in South Africa: hourly rates, the right roller and what the quote must cover

In short

Grader hire in South Africa is charged by the hour. Municipal tariffs for 2025/26 and 2026/27 put a grader hour between R867.00 (Moretele) and R2,354.89 excluding VAT (Musina, wet rate), and a roller or compactor hour between R242.00 and R1,050.06. Compare quotes on the same basis: operator, fuel, VAT, transport, and the compaction the layer must reach.

Tell us what plant you need

Headcore7 min read11 sources

What does grader hire cost per hour in South Africa?

Four municipal tariff books put a grader hour between R2,354.89 excluding VAT (Musina, 2025/26, wet rate) and R867.00 (Moretele, 2025/26). Hire companies set their own rates for plant hire; the tariffs show how far a rate moves with what it includes, and Moretele's does not state its VAT basis.[2][3][4][5]

What does grader hire cost per hour in South Africa?
Municipality and tariff yearLine as printedRate per hourVAT and inclusions
Musina, approved 2025/26Motor grader, 140k (wet rate)R2,354.89 (R2,232.12 in 2024/25)Excluding VAT (the schedule's general note)
Setsoto, 2026/27, from 1 July 2026Hire of grader per hour, driver includedR1,640.00 excluding VAT (R1,886.00 including VAT)Unchanged from R1,640.00 excluding VAT in 2025/26
Dr JS Moroka, 2026/27GradersR1,275.62 (R1,227.74 in 2025/26)Including VAT
Dr JS Moroka, 2026/27GraderR1,063.02 (R1,023.12 in 2025/26)Including VAT
Moretele, final 2025/26Hiring of grader per hourR867.00 (R830 in 2024/25)VAT basis not stated; the 2026/27 schedule, headed draft, shows R899.08

Sources:[2][3][4][5][6]

What does roller hire cost per hour?

Municipal tariffs put a roller or compactor hour between R242.00 and R1,050.06. Siyancuma's 2026/27 tariff charges R242.00 including VAT (R210.43 in its tariff column) for a small roller, up from R231.00 in 2025/26, on a dry basis: the roller leaves with a full tank and must come back with one.[7]

Moretele's final 2025/26 schedule charges R488.00 an hour for a smooth roller, without stating a VAT basis; its 2026/27 schedule, headed draft, shows R506.06. Musina's approved 2025/26 tariff charges R1,050.06 an hour, excluding VAT, for a compactor and does not name the type.[5][6][2]

The rates differ in what they include. A wet rate covers the operator and fuel, a dry rate leaves both to the hirer, and the TLB hire prices guide sets out how public buyers count hours, standby and downtime on the same terms.[2][3][7][8]

Which grader and roller sizes do public buyers hire?

In practice, graders are hired by operating mass and rollers by type and mass. Cape Winelands District Municipality's plant hire tender, which closed on 19 March 2025, asked for rubber-tyred graders with an operator in mass classes from 5 to 13 tonnes, 13 to 17 tonnes and a heaviest class above that. Each offer had to state whether the grader is articulated or rigid and fitted with a ripper and scarifier.[8]

The same tender listed four roller types with operators: flat steel wheel tandem and 3-wheel rollers from 10 to 20 tonnes, pneumatic rollers from 15 to 28 tonnes, vibrating rollers from 10 to 25 tonnes and padfoot rollers from 10 to 18 tonnes.[8]

The tender also asked each machine's year of manufacture, set its grader sub-classes by that year, and accepted graders only with a current licence registration certificate. Ask for both in a quote.[8]

Which roller do I need: smooth drum, padfoot or pneumatic?

The material decides. A roller maker's soil compaction guidance says "Cohesive soils are best compacted using compactors with padfoot drums and high amplitudes", while "non-cohesive soils are more effectively compacted with smooth drums and lower amplitudes".[11]

For layer work, the Guidelines for Human Settlement Planning and Design, compiled by the CSIR, say standard practice "should be to roll the layer to refusal density based on proof rolling of a short section prior to its full compaction". The same text warns that "Hand-held rollers may be inadequate to achieve the required density".[9]

The same guidelines put the thickness of a gravel wearing course at usually a standard 150 mm, and name inadequate compaction or low cohesion, combined with traffic, as the normal cause of corrugations on gravel streets.[10]

How dense must each layer be compacted?

The CSIR guidelines' table 8.14 sets the highest minimum, 100% to 102% of modified AASHTO density, for a G2 crushed stone base, and the lowest, 85%, for subgrade within material depth. A G3 crushed stone or G4 gravel base needs 98%. Put the figure your engineer specifies in the request, with who tests it.[9]

How dense must each layer be compacted?
Pavement layerMinimum compacted density
Base: crushed stone G2100% to 102% mod AASHTO
Base: crushed stone G3 and gravel G498% mod AASHTO
Subbase, upper and lower95% mod AASHTO
Selected subgrade93% mod AASHTO
Subgrade within 200 mm of the selected subgrade90% mod AASHTO
Subgrade within material depth85% mod AASHTO

Sources:[9]

Do I need a water cart with the grader and roller?

Usually: a gravel layer reaches its specified density most easily at the correct moisture content. The CSIR guidelines note that densities below base level are "relatively easily achieved if compaction is carried out at the correct moisture content", and list watering with grading and adding material as the frequent maintenance gravel streets need.[9][10]

Cape Winelands' 2025 tender hired self-propelled water tankers with suction, a pressure pump, a spray bar and an operator, in classes from 8,000 to 16,000 litres.[8]

Dr JS Moroka's 2026/27 tariff, including VAT, charges R1,594.53 an hour for a water cart (R1,534.68 in 2025/26) and R488.33 an hour for a 10,000-litre water truck (R470.00 in 2025/26). Say in the request where water can be drawn on or near site.[4]

Who may operate a grader or roller on site?

Building or maintaining a road, and moving earth, is construction work under regulation 1 of the Construction Regulations, 2014, and a grader or roller used for it is mobile plant: machinery "able to move independently".[1]

Regulation 23(1)(d) requires the operator to have "received appropriate training", be "certified competent and in possession of proof of competency" and be authorised in writing. The operator also needs a medical certificate of fitness from an occupational health practitioner in the form of Annexure 3.[1]

Regulation 23(1)(k) requires the operator to inspect the machine daily against a checklist and record the findings in a register kept in it. On a public road, regulation 23(2)(j) requires the machine to comply with the National Road Traffic Act, 1996.[1]

What to put in your request

  • The road or yard: length and width, the layers to build (for example a 150 mm gravel wearing course) and the material, gravel or clay.[10][11]
  • The compaction to reach, as a percentage of mod AASHTO density per layer, and who will test it.[9]
  • The machines: grader mass class, articulated or rigid, with or without ripper and scarifier; roller type and mass; water tanker size with a spray bar.[8]
  • Wet or dry hire: whether the rate covers the operator and fuel, the rate per hour, minimum hours and standby.[2][3][7][8]
  • Transport to site as its own line: a rate per kilometre, one way or both ways, from where.[8]
  • Where water can be drawn on or near site.[9][8]
  • Each machine's year of manufacture and current licence registration certificate.[8]
  • The operators' proof of competency, written authorisation and Annexure 3 medical certificate, and the daily checklist register.[1]
  • The VAT basis of every rate.[3][5]

Questions buyers ask

What is the difference between wet and dry grader hire?

A wet rate includes the operator and fuel; a dry rate leaves them to the hirer. Musina's 2025/26 tariff prices its motor grader at a wet rate, Setsoto's 2026/27 tariff includes the driver, and Siyancuma's 2026/27 tariff hires plant dry, with a full tank out and a full tank back.[2][3][7]

How is a grader moved to site?

Either under its own power or on a lowbed. Cape Winelands' 2025 tender paid one rate per kilometre, on the one-way distance from the hire company's premises, whether rubber-tyred plant drove or rode on a mechanical horse and low-bed trailer. No hire was charged while the machine was in transit.[8]

Does a hired grader need to be licensed for the road?

Cape Winelands District Municipality's 2025 tender accepted graders only with a current licence registration certificate, and said tyred plant without one may be considered for off-road work only. On a construction site, regulation 23(2)(j) of the Construction Regulations, 2014 requires mobile plant travelling or working on a public road to comply with the National Road Traffic Act, 1996.[8][1]

Tell us what plant you need

Sources

  1. Department of Labour (Government Gazette 37305), Construction Regulations, 2014 (GN R.84), 7 February 2014.
  2. Musina Local Municipality, Schedule 8: approved rates and tariffs 2025/2026 (hire of equipment; tariffs excluding VAT unless stated otherwise), 2025/26 financial year.
  3. Setsoto Local Municipality, Tariffs 2026/2027 (sundry tariffs: hire of grader), Applicable from 1 July 2026.
  4. Dr JS Moroka Local Municipality, Tariff structure 2026/2027, council resolution R472.05.2026: leasing and hiring of municipal equipment (inclusive of VAT), Resolution of 29 May 2026, 2026/27 financial year.
  5. Moretele Local Municipality, Final 2025/26 schedule of rates and tariffs (machinery and equipment hire), 2025/26 financial year.
  6. Moretele Local Municipality, 2026/27 schedule of rates and tariffs, headed draft (machinery and equipment hire), 2026/27 financial year.
  7. Siyancuma Local Municipality, Tariffs for the 2026/2027 financial year (rental rates for vehicles and equipment), 2026/27 financial year.
  8. Cape Winelands District Municipality, Tender T 2025/015: the hiring of mechanical and construction plant equipment for the period ending 30 June 2028 (specification and pricing schedules), Closing date 19 March 2025.
  9. CSIR (for the Department of Housing), Guidelines for Human Settlement Planning and Design, Volume 2, Chapter 8: Roads: materials and construction, PDF of 22 October 2009.
  10. CSIR (for the Department of Housing), Guidelines for Human Settlement Planning and Design, Volume 2, Chapter 8: Roads: materials and construction (unpaved streets), PDF of 22 October 2009.
  11. Wirtgen Group, Soil compaction (earthworks applications), Read 15 November 2026.