18 cube tipper hire: what the truck carries and what to ask
Describe the material, the trips and how long you need the truck. Headcore puts your request in front of companies that hire out tipper trucks and serve your area, and each decides whether to respond.
Free to post. Nothing reaches suppliers until you review and post it.
- Reaches matching companies within minutes
- Anonymous to suppliers until you choose to reveal
- You choose who to talk to
What details help?
All optional. Mention what you know.
- The load. Soil, rubble, sand or rock, and roughly how many cubes or loads.
- Truck size. 6 or 10 cube, or bigger, if you know, and how many trucks.
- How long. Days or weeks, and the date you need it on site.
- The site. The town, access for a truck or lowbed, and the ground conditions.
See an example request
Illustrative, not a real request.
We want to hire one 18 cube tipper with a driver by the day for a month, hauling crushed stone from a quarry to a road project.
- About 5 loads a day over 25 km
- Site near Polokwane, Limpopo
How Headcore helps with 18 cube tipper hire
Keep your usual transport company in the mix. Headcore helps you find additional companies that can supply this.
- 01
Describe the material and the trips
Start in your own words: what material, how many loads a day and how far. You review the request before anything is posted.
- 02
Reach companies that hire out tippers
Companies that hire out tipper trucks and serve your area see the request. Each decides for itself whether to respond.
- 03
Choose who to speak with
Compare how they would approach it, reveal your company only to the ones you choose, and deal with them directly.
Before you hire an 18 cube tipper
Hire, not purchase
This page is for taking an 18 cube tipper on hire, usually with a driver, for a job. It does not cover buying one.
The weight, not the cubes
A truck is limited by what it may legally carry in kilograms, not by its volume: 18 m³ of crusher run weighs about as much as the whole GVM of one advertised 18 m³ truck. Say the material and ask for the payload and the tare.
How you want it priced
Published council documents price tippers by the hour, the day or the cubic metre and kilometre. Say which basis you want, and whether the rate includes the driver and diesel.
Access and where it tips
A truck this size needs room to get in, turn and tip on firm, level ground. Say if the way in is tight, the ground is soft or there are overhead lines.
In short
This page is about hiring an 18 cube tipper, not buying one. The 18 cubes are a volume, and what the truck may carry is a mass that differs by truck: one sale advertisement for an 18 m³ 8x4 tipper gives a GVM of 33,400 kg and no tare or payload, and 18 m³ of crusher run alone would weigh about 33,100 kg. Ask for the payload, the tare and the driver's licence code.
What is an 18 cube tipper truck?
An 18 cube tipper is a rigid tipper described by a volume of about 18 cubic metres, and that number does not tell you what the truck may carry. Documents use cube ratings differently. Cape Winelands District Municipality's 2025 request for plant hire prices works a truck's capacity in cubic metres out from its legal certified payload, at 1,679 kg per cubic metre to the nearest cubic metre, and hires tippers in 5, 8, 10, 17 and 22 cube categories, with none of 18. That rule is the document's convention for its own hire, and it gives no figure for an 18 cube truck.[1][2]
Payload differs from truck to truck. One sale advertisement for a new 18 m³ tipper gives an 8x4 layout and a gross vehicle mass of 33,400 kg, and states neither a tare nor a payload. The Act defines the gross vehicle mass as the maximum mass of the vehicle and its load, and the tare as the mass of the vehicle ready to travel, so what such a truck may carry is its GVM less its tare, and its axle ratings can lower that further. Ask the company for the payload and the tare of the truck it would send.[2][3][6]
How much does a load of 18 cubes weigh?
Eighteen cubic metres of common material weighs about this, at indicative loose densities from a United Kingdom reference, which says to use the supplier's figure where accuracy matters and that water adds weight. The third column takes each weight off the 33,400 kg GVM in one sale advertisement for an 18 m³ 8x4 tipper, which states no tare: what is left is the most the truck itself may weigh, body included, for that load to stay within the GVM. It is a calculation, not a payload, and the axle ratings can lower what a truck may carry, so ask for the tare and the payload.[5][2][3][6]
| Material | 18 m³ at the indicative density | Left of a 33,400 kg GVM for the truck itself |
|---|---|---|
| Topsoil | About 23,490 kg, at 1,305 kg/m³. | About 9,910 kg. |
| Crushed stone, 38 to 63 mm | About 26,690 kg, at 1,483 kg/m³. | About 6,710 kg. |
| Building sand | About 27,770 kg, at 1,543 kg/m³. | About 5,630 kg. |
| Crushed stone, 19 mm | About 28,840 kg, at 1,602 kg/m³. | About 4,560 kg. |
| Road base or crusher run | About 33,100 kg, at 1,839 kg/m³. | About 300 kg, so a full 18 m³ would put that truck over its GVM. |
How is an 18 cube tipper charged for?
No published document read for this page prices an 18 cube tipper at a rand figure, so this page gives none. What the documents show is the basis: one council's hourly tariff for its own 6 and 10 cube trucks, and one request for hire prices with day and cubic-metre-and-kilometre categories. Read them as examples of the basis, not as a rate a hire company will ask. The tipper hire rates article sets out more bases and what a response should include.[4][1]
| Basis | What a published source shows | To settle in the request |
|---|---|---|
| By the hour | Dr JS Moroka Local Municipality's tariff for 2026/27, set by council resolution of 29 May 2026, lists tipper trucks of 6 cubic metres at R325.41 an hour and 10 cubic metres at R488.33 an hour, under rental of construction vehicles in a section headed inclusive of VAT. It lists no 18 cube truck and does not say whether the driver or fuel is included. | Minimum hours, travel to site, and whether the rate includes the driver and diesel. |
| By the cubic metre and the kilometre | The Cape Winelands document priced tippers by distance hauled: a rate per cubic metre per kilometre, multiplied by the trips recorded over a set distance, with a trip counted as the one-way distance from loading to offloading. It says the cubic capacity of a vehicle is the one recorded on its capacity certificate, so on this basis the certified payload behind the cube rating sets what is paid for. The form publishes no rate. | Whose capacity certificate applies, how a trip is counted, and who loads and tips. |
| By the day | In its category for tipper trucks hired by the day, the same document asked for a rate per day inclusive of fuel, oil and operator, for 5, 8, 10, 17 and 22 cube trucks, and states that standby rates are not applicable with daily rates. The form publishes no rate and has no 18 cube line. | What counts as a day, the hours it covers and who pays for waiting. |
What rules apply to an 18 cube tipper and its driver?
A tipper may not exceed its mass limits on a public road. Regulation 239(1)(a) of the National Road Traffic Regulations, 2000 bars operating a goods vehicle if its gross vehicle mass, any gross axle massload or any gross axle unit massload is exceeded, so the truck's mass ratings, not its cube count, set how much it may carry. Regulation 246(c) bars carrying goods that are not "safely contained within the body" or "securely fastened" and that are not "properly protected from being dislodged or spilled".[6]
A goods vehicle with a gross vehicle mass of 12,000 kg or more may be at most 2.6 metres wide (regulation 223(b)), and a motor vehicle with its load at most 4.3 metres high (regulation 224(b)), which matters at gates, under cables and on tight sites.[6]
The driver's licence code and professional driving permit follow the truck's GVM. Code C covers a goods vehicle with a GVM above 16,000 kg, with or without a trailer of up to 750 kg, so a truck in that class needs a driver holding at least code C (regulation 99 as restated by GN R. 846 of 2014). The driver of a goods vehicle above 3,500 kg GVM must also hold a professional driving permit, subject to the exceptions in regulation 115(2) (regulation 115(1)(a)). Ask for the truck's GVM and check it against the code on the driver's licence card.[7][6]
What should a request for an 18 cube tipper say?
Usually, a company can price the job once the request covers the following.
- The material, and the tons or loads a day, so the company can work out how many trucks it takes.
- The payload and the tare of the truck, in writing, since an 18 cube label states neither and the payload differs from truck to truck.[2][3]
- The distance between where the truck loads and where it tips, and whether the route has tight turns, low overhead lines or a width or height limit.
- Site access and the tipping spot: firm, level ground, room to turn, and who loads the truck.
- Whether the driver and the diesel are included, or whether you supply a driver who holds the licence code and permit the truck's GVM requires.
- The basis you want it priced on, by the hour, the day or the cubic metre and kilometre, with VAT shown as its own line.
Sources
- Cape Winelands District Municipality, Tender T 2025/015: the hiring of mechanical and construction plant equipment for the period ending 30 June 2028 (specification clause 3.2.3.4, kilometre lead rates and categories 17(a) and 17(d)), Closing date 19 March 2025.
- Truck & Trailer (sale advertisement), New 2026 J5N 35.340FD 18m3 Tipper for sale in Gauteng, Undated advertisement, shown as updated a day before it was read on 19 November 2026.
- President's Office (Government Gazette 17603), National Road Traffic Act 93 of 1996: section 1 (definitions of gross vehicle mass and tare), 22 November 1996.
- Dr JS Moroka Local Municipality, Tariff structure 2026/2027, council resolution R472.05.2026: leasing and hiring of municipal equipment, rental of construction vehicles per hour, Resolution of 29 May 2026, 2026/27 financial year.
- Designing Buildings (the Construction Wiki, United Kingdom), Converting between weight and volume for bulk construction materials, Last edited 21 September 2026.
- Department of Transport (Government Gazette 20963), National Road Traffic Regulations, 2000 (GN R. 225): regulations 115, 223, 224, 239 and 246, 17 March 2000.
- Department of Transport (Government Gazette 38142), Amendment of the National Road Traffic Regulations (GN R. 846): regulation 99 (licence codes), 31 October 2014.
Last checked: 19 November 2026
How Headcore works
- Posting a request is free.
- Your request goes to companies that do the kind of work you describe.
- A supplier answers with a response that says how they would do the job. You read the responses and decide who to talk to.
Questions buyers ask
What does it cost to post a request?
Posting a request is free. A supplier pays one token when it decides your request is worth answering. What you agree about the work is between you and the supplier.
Who sees my request?
Companies that do this specific work, within reach of your site. They see the job. Whether they also see your company name is your choice: you can stay anonymous until you pick who to talk to.
What if nobody responds?
Your request reaches companies that do this work within minutes. Each decides for itself whether to respond, so we cannot promise responses. If the work cannot wait, contact your usual suppliers as well.
Can I hire tipper trucks with drivers?
Yes. Say how many trucks and drivers you need, and whether a machine on site loads them. Suppliers respond to the job as you describe it.
How is tipper hire usually charged?
By the day, by the load or by the hour. Say how many loads and how far they go, and suppliers respond to the job as described.
Who arranges where the load is tipped?
Say where it must go: a stockpile on site, a licensed dump site or another site. Building waste has its own rules, so check them first. If you need the supplier to find a dump site, say so in your request.
Does Headcore hire out equipment?
No. Headcore is a matching system: it puts your request in front of companies that do this work, and you deal with the supplier directly. Keep your usual suppliers; use Headcore when they cannot help, or when the job is outside what they do.
Start with what you know.
A sentence or two is enough. Nothing reaches suppliers until you review and post it.
Start your request