Mobile crane hire: how to choose the tonnage and boom length for your lift in South Africa
Headcore
In short
Choose a hired mobile crane by its load chart at your working radius, not its headline tonnage: one 50 t crane's chart gives 42 t at 3 m but 13.4 t at 10 m. The hook block counts as part of the load. In South Africa, ask for a performance test certificate under 12 months old and a licensed operator.
What size mobile crane do I need?
You need the mobile crane whose load chart shows enough capacity for your load at your working radius and boom length. The headline tonnage applies only at the shortest radius: one manufacturer's chart for a 50 t crane gives 50 t at 3 m, and only over the rear.[9]
In South Africa, regulation 18(1)(b) of the Driven Machinery Regulations, 2015 requires the load chart: where the safe working load varies with the conditions of use, "a table showing the safe working load with regard to every variable condition" must be posted where the operator can see it.[1]
The hook block counts as load: the remarks to that manufacturer's chart say it "is part of the load" and must be deducted from the chart figures. The slings and shackles below it are lifting tackle, gear "used to attach a load to a lifting machine".[9][1]
Working radius is measured from the crane's slewing centre to the hook, and it matters at both the pick-up and the set-down point.[9]
Height sets the boom length, and a longer boom costs capacity: at 6 m radius the same 50 t crane lifts 22.7 t on a 22 m boom but 7.5 t on its full 38 m boom.[9]
Wind limits bulky loads: the same chart assumes a wind speed of at least 9 m/s and 1 m² of sail area per tonne, and the permitted wind speed has to be reduced for loads with a larger sail area.[9]
How much can a 50 t mobile crane lift at each radius?
One maker's three-axle 50 t mobile crane lifts 42 t at 3 m, 13.4 t at 10 m and 4.4 t at 20 m: the best figures in its 2023 chart on outriggers with 9 t counterweight, slewing through 360°, before the hook block is deducted.[9]
| Working radius | Boom length with the most capacity | Capacity on the chart |
|---|---|---|
| 3 m | 11.4 m | 42 t (50 t over the rear only) |
| 6 m | 16.7 m | 26 t |
| 8 m | 22 m | 18.6 t |
| 10 m | 22 m | 13.4 t |
| 12 m | 22 m or 27.3 m | 10.1 t |
| 16 m | 27.3 m or 32.6 m | 6.4 t |
| 20 m | 32.6 m | 4.4 t |
| 24 m | 38 m | 3.2 t |
| 30 m | 35.8 m or 38 m | 1.9 t |
Sources:[9]
What must a hired mobile crane have in South Africa?
In South Africa, a mobile crane needs a thorough examination and performance test "by a lifting machinery inspector of a lifting machinery entity" before first use, after being re-erected and "at intervals not exceeding 12 months" (Driven Machinery Regulations, regulation 18(5)(a)). Regulation 18(5)(c) excludes mobile cranes from the performance test "after each re-deployment within the 12-month period".[1]
The inspector must be registered with the Engineering Council of South Africa and work for an entity the chief inspector has approved and registered, which "shall on request produce a certificate of registration" (regulations 1 and 19(4)).[1]
Ropes, hooks, sheaves, brakes and safety devices need a thorough examination by a competent person at least every six months (regulation 18(6)), and slings and other lifting tackle at least every three months by a competent person appointed in writing (regulation 18(10)(e)).[1]
A power-driven lifting machine with a lifting capacity greater than 5,000 kg may not be used without "a load indicator" showing the mass being lifted "and/or" "a load-limiting device" that stops the drive above the safe working load "at that particular radius" (regulation 18(9)).[1]
For a hired machine, regulation 18(7)(b) makes the user keep on its own premises "the latest applicable performance test and service records not older than 12 months".[1]
Who may operate a hired mobile crane?
Only an operator trained for that type of crane, with a certificate of training from an accredited provider approved by the chief inspector, because mobile cranes are listed in the National Code of Practice for Training Providers of Lifting Machine Operators (regulation 18(11)).[1][2]
The 2024 Code of Practice gives each crane class its own licence code: C43 for hydraulic mobile cranes up to 15,000 kg, C33 up to 50,000 kg, C35 above 50,000 kg, C32 for truck-mounted cranes, and C37 to C40 for lattice boom truck and crawler cranes.[2]
The licence or carry card "will be valid for a period of up to 24 months" and shows the machine code, capacity and expiry date (paragraph 14.2).[2]
On a construction site a mobile crane is also mobile plant, machinery "able to move independently", under the Construction Regulations, 2014. Its operator must then be certified competent, "authorised in writing" and hold a medical certificate of fitness, and must inspect the crane daily against a checklist, with the findings recorded in a register kept in the machine (regulation 23(1)(d) and (k)).[3]
Who plans the lift, and who carries the risk?
On a construction site, the lift falls under the risk assessment that a competent person, appointed in writing, must do before work starts (Construction Regulation 9(1)). Neither the Driven Machinery Regulations nor the Construction Regulations use the words "lift plan" for a mobile crane.[1][3]
SANS 12480-1:2006, reaffirmed in 2017, is the South African standard for the safe use of cranes: it covers planning, selection and operation, and the selection of drivers, slingers and signallers.[8]
Near overhead power lines, no person may encroach "in person or with objects" on the minimum safety clearances "except by permission of the supplier, employer or user operating the power line" (Electrical Machinery Regulations, 2011, regulation 19(5)).[5]
The client carries duties too: the Occupational Health and Safety Act makes the "user" of machinery whoever uses it for their own benefit "or who has the right of control over the use" of it, and excludes the lessor (section 1).[4]
Section 37(1) presumes that an employer or user did what its employee did, unless it proves the conditions listed there. Section 37(2) says this "shall mutatis mutandis apply in the case of a mandatary of any employer or user, except if the parties have agreed in writing to the arrangements and procedures between them to ensure compliance by the mandatary with the provisions of this Act". A mandatary includes "a contractor or a subcontractor for work" (section 1), so write those arrangements into the hire agreement: who supervises the lift, who rigs the load and who checks the ground.[4]
What should a mobile crane hire quote include?
A mobile crane hire quote should name the crane model and its configuration for your lift (boom length, counterweight, radius and the chart capacity at that radius): a tonnage class alone does not show that the crane can do the job.[9]
In practice, the crane company also needs to know the ground. A crane manufacturer's technical trainer, in the maker's customer magazine, puts sand and gravel at around 200 kN/m² (about 20 t per m²) and rock at over 1,500 kN/m². The article's example, one of the maker's medium-sized mobile cranes, can press up to 1,109 kN onto one 0.6 m by 0.6 m pad; on 300 kN/m² ground that needs about 3.7 m² of support area.[10]
The same article names poor ground stability as one of the most common causes of crane accidents and calls for an expert study where the bearing capacity is in doubt.[10]
Set-up time costs money: an article supplied to Engineering News in 2025 by a truck-crane supplier says quicker set-up "translates into less paid downtime".[11]
A crane over the National Road Traffic Act's limits needs a written authorisation under section 81, as substituted in 2008: from the Minister for a vehicle that "due to such vehicle's original design cannot comply with this Act", or from the MEC for a load carried "otherwise than in accordance with this Act", in both cases "after the applicant has paid the fees or charges" and "subject to such conditions" as they determine. Ask whether permit fees and conditions are in the price.[6][7]
What to put in your request
- The load: what it is, its mass in tonnes from the nameplate, drawing or delivery note, its dimensions and its lifting points.[9][1]
- The working radius at the pick-up and the set-down point, measured from where the crane can stand, and the height the load must reach or clear.[9]
- The ground where the crane will stand (paving, compacted fill or a slab), any trenches or buried services nearby, and the space available to set up.[10]
- Overhead power lines near the lift or the access route, and who operates them.[5]
- The date, the number of lifts and the route into site, with any width or height limits.[6]
- The load chart for the proposed boom and radius, and the crane's latest performance test certificate from a lifting machinery entity approved and registered by the chief inspector, not older than 12 months.[1]
- The operator's licence, showing the code for this crane class (C33 for a hydraulic mobile crane up to 50 t, for example) and an expiry date still ahead.[2]
- On a construction site: the operator's medical certificate of fitness and written authorisation, and who does the risk assessment.[3]
- Who supplies the rigger, signaller and slings, and the slings' examination record, no older than three months.[1][8]
Questions buyers ask
Do I need my own copy of the crane's load test certificate?
Yes. In South Africa, regulation 18(7)(b) of the Driven Machinery Regulations makes every user of a leased lifting machine keep on its premises a register with the latest performance test and service records, not older than 12 months. Ask the crane company for a copy before the crane arrives.[1]
Will a crane truck do instead of a mobile crane?
It depends on the load and the radius, so check the crane truck's own load chart at your radius. An article supplied to Engineering News in 2025 by a truck-crane supplier says truck-mounted cranes have lower lifting capacities and vertical reach than the larger crawler and mobile cranes it compares them with. The 2024 Code of Practice licenses them under their own code, C32, so the operator needs that code on the licence.[1][11][2]
Does a large mobile crane need a permit to reach site?
If it exceeds the dimension or mass limits of the National Road Traffic Act, it needs a written authorisation under section 81: from the Minister for a vehicle whose original design cannot comply, or from the MEC for a load, with the fees and conditions they set. Ask who applies for it, and have the permit's cost and conditions written into the quote.[6][7]
Sources
- Department of Labour (Government Gazette 38905), Driven Machinery Regulations, 2015 (GN R. 540), 24 June 2015.
- Department of Employment and Labour (Government Gazette 51711), Incorporation of the National Code of Practice for the Training Providers of Lifting Machine Operators into the Driven Machinery Regulations, 2015, 6 December 2024.
- Department of Labour (Government Gazette 37305), Construction Regulations, 2014 (GN R.84), 7 February 2014.
- Government Gazette 14918, Occupational Health and Safety Act 85 of 1993, 2 July 1993.
- Department of Labour (Government Gazette 34154), Electrical Machinery Regulations, 2011 (GN R.250), 25 March 2011.
- Office of the President (Notice 1892 of 1996), National Road Traffic Act 93 of 1996, 22 November 1996.
- The Presidency (Government Gazette 31907), National Road Traffic Amendment Act 64 of 2008 (section 23 substitutes section 81), 17 February 2009.
- SABS Standards Division, SANS 12480-1:2006 (Ed. 1.00), Cranes: Safe use, Part 1: General, 28 March 2006, reaffirmed 7 July 2017.
- Liebherr-Werk Ehingen, LTM 1050-3.1 mobile crane: technical data and load charts, 2023.
- Liebherr (UpLoad customer magazine), Underground for safe crane jobs, 2022 (UpLoad issue 02/2022).
- Engineering News (Creamer Media), supplied article, Cut costs and keep moving: the case for truck-mounted cranes, 11 December 2025.