RFQ template: what a South African request for quotation should contain so that quotes compare

In short

An RFQ template sets out the job, the site, the dates, the price format and the documents each contractor must send, so that every quote prices the same work. South African public RFQs fix a closing date, a validity of 60 to 120 days and VAT on its own line. Construction work adds a health and safety specification.

What work do you need done?

Headcore8 min read11 sources

What should a request for quotation include?

A request for quotation should describe the work, fix the dates and set the price format, so that quotes compare line by line. The Durban ICC's request BS 08/2025, for upgrading an evaporative condenser unit, shows the parts a South African public buyer uses.[6]

The Durban ICC request opened with the background and purpose of the work. Three mandatory requirements followed: two client references, a guarantee of at least two years on all equipment and public liability insurance of at least R1 million.[6]

Next came a pricing schedule, the documents each bidder had to send, the terms and a contact person. The site inspection on 11 February 2025 was compulsory, and quotes closed at 12:00 on 17 February 2025.[6]

For construction work, the client's own duties under the construction regulations shape the request as well, starting with the health and safety specification.[1]

What does an RFQ template look like, block by block?

An RFQ template has eight blocks, in the order the South African public requests for quotation read for this page use them. Copy them, and fill each one for your job.[6][8][7]

What does an RFQ template look like, block by block?
BlockWhat to writeExample from a public RFQ
Reference and descriptionA reference number, the job in one line, the siteBS 08/2025: upgrade of an evaporative condenser unit (Durban ICC, 2025)
Scope and specificationWhat must be supplied, done and tested, with quantitiesSupply, delivery, installation and start-up of the complete scope (Durban ICC, 2025)
Mandatory requirementsWhat disqualifies a quote if missingTwo references, a guarantee of at least two years, public liability insurance of at least R1 million (Durban ICC, 2025)
Site inspectionCompulsory or not, date, time and meeting pointCompulsory, 11 February 2025 at 11h00 (Durban ICC, 2025)
Closing date and validityWhen quotes close, and how long they must stay open60 days after closing (CTICC, RFQ 013/2026); 60 working days (C-BRTA, RFQ 28-01-2025)
Pricing scheduleOne price per line, a subtotal excluding VAT, VAT and a total including VATSubtotal (VAT excl.), VAT at 15%, grand total (VAT incl.) (Durban ICC, 2025)
Returnable documentsRegistration and tax details, declarations, safety documentsTax compliance PIN, B-BBEE certificate, CIDB registration for construction contracts, OHS Act declaration (Durban ICC, 2025)
TermsThe price covers all the work; the buyer may cancel the requestPrice deemed inclusive of all required work; the buyer may cancel before award (Durban ICC, 2025)

Sources:[6][8][7]

Does the client have to give the contractor a health and safety specification?

Yes, for construction work. The Construction Regulations, 2014 make the client prepare a baseline risk assessment and a health and safety specification (regulation 5(1)(a) and (b)). The client must "include the health and safety specification in the tender documents" (regulation 5(1)(f)).[1]

Tendering principal contractors must have "made adequate provision for the cost of health and safety measures" (regulation 5(1)(g)). The one appointed must have "the necessary competencies and resources to carry out the construction work safely" (regulation 5(1)(h)).[1]

Before work starts, every principal contractor must be registered and in good standing with the Compensation Fund or a licensed compensation insurer (regulation 5(1)(j)).[1]

Regulation 5 does not apply to construction work on a single-storey dwelling for a client who will live in it (regulation 2(2)).[1]

Section 37(2) of the Occupational Health and Safety Act extends an employer's presumed liability to a mandatary's acts. The exception is where "the parties have agreed in writing to the arrangements and procedures between them". The OHS Act page sets out that agreement.[2]

Which documents should a contractor send with the quote?

In practice, public buyers ask for registration and tax details, proof of tax compliance, a B-BBEE certificate, CIDB registration for construction contracts and signed declarations. The Durban ICC's 2025 request would not consider a quote without them.[6]

Tax compliance is shown with a PIN, not a certificate. SARS says a third party checks it on eFiling or the SARS Online Query System with the taxpayer's reference number and PIN. The result shows the status "at the date and time the PIN is used": green for compliant, red for not.[5]

The same request asked each bidder to sign a declaration under the OHS Act. The bidder confirms the competence and resources to work safely, a health and safety plan on request and a price that covers health and safety measures.[6]

Each of the other documents has its own page: the COIDA letter of good standing, the CIDB grading and the B-BBEE certificate.[6][1]

How long should a quote be valid?

In practice, the three South African public requests for quotation read for this page asked for prices valid for 60 to 120 days. The Cape Town International Convention Centre's RFQ 013/2026, which closed on 19 May 2026, asked for 60 days after the closing time.[7]

The Cross-Border Road Transport Agency's RFQ 28-01-2025 asked for 60 working days from the official closing date. The Localisation Support Fund's RFQ_24_012, issued on 3 May 2024, asked for 120 days.[8][9]

State the validity in the request itself. Set it longer than your own approval takes, so that no quote lapses before you can accept it.[7][8][9]

Should the quote show VAT separately?

A VAT vendor's quote must include VAT, or show the VAT, the price excluding VAT and the price including VAT together. Section 65 of the Value-Added Tax Act 89 of 1991 says any price "advertised or quoted by any vendor" for a taxable supply "shall include tax". The quote must also say that it does.[3][4]

Section 64(1) deems any price a vendor charges for a taxable supply to include the VAT payable. A vendor is a person who is, or is required to be, registered under the Act (section 1).[3][4]

VAT is levied on supplies made by a vendor (section 7(1)(a)). Ask each contractor for its VAT registration number, and compare quotes on their prices excluding VAT.[3][4]

What scope should the request give for hire, repair or installation?

In practice, the scope block changes with the kind of job. For plant hire, George Municipality's 2024 tender asked for an hourly working rate, a standing time rate and a wet or dry basis.[11]

For a repair, Nelson Mandela Bay Stadium's request of 4 September 2026 asked for a labour rate per hour and the mark-up on third-party quotes. It also wanted a diagnosis report, testing after repair, a warranty of at least six months and a job card listing parts and labour.[10]

For supply and installation, the Durban ICC's 2025 request priced the complete scope as one line. Additional costs went on a separate line, with the delivery time from the purchase order.[6]

The pages on a plant hire agreement, hydraulic cylinder repair and a steel fabrication quote give the scope lines for those jobs.[11][10]

What to put in your request

  • A reference number, the job in one line, the site address and the access hours.[6]
  • The scope: what must be supplied, done and tested, with quantities, drawings and the standard the work must meet.[6]
  • The requirements that disqualify a quote if missing, such as references, a warranty period and the minimum public liability insurance.[6]
  • The site inspection: compulsory or not, with the date, time and meeting point.[6]
  • The closing date and time, and how long the quote must stay valid after closing.[7][8]
  • A pricing schedule with one price per line, a subtotal excluding VAT, the VAT and the total, and the VAT registration number.[6][3]
  • The documents to send: tax compliance PIN, COIDA letter of good standing, CIDB grade for construction work and a B-BBEE certificate or affidavit.[6][5][1]
  • For construction work: your health and safety specification, and a line in the price for the cost of health and safety measures.[1]
  • The written arrangements under section 37(2) of the OHS Act that the appointed contractor will sign.[2]
  • A contact person for questions, and the date by which questions must be in.[6][7]

Questions buyers ask

Must a contractor's quote include VAT?

If the contractor is a VAT vendor, yes. Section 65 of the Value-Added Tax Act requires a quoted price to include VAT and say so. The exception is a quote that shows the VAT, the price excluding VAT and the price including VAT.[3][4]

How do I check a contractor's tax compliance?

Ask for its tax reference number and Tax Compliance Status PIN, and enter both on SARS eFiling or the SARS Online Query System. The result shows the status at the moment you check it, in green or red.[5]

Do I need a health and safety specification for a small job?

For construction work, regulation 5(1) of the Construction Regulations, 2014 requires one from the client whatever the job's size. The only exception in regulation 2(2) is construction work on a single-storey dwelling for a client who will live in it.[1]

What work do you need done?

Sources

  1. Department of Labour (Government Gazette 37305), Construction Regulations, 2014 (GN R.84), 7 February 2014.
  2. Government Gazette 14918, Occupational Health and Safety Act 85 of 1993, 2 July 1993.
  3. Government Gazette 13307, Value-Added Tax Act 89 of 1991 (as enacted), 12 June 1991.
  4. South African Revenue Service (legislation library, LexisNexis), Value-Added Tax Act, No. 89 of 1991, current text: sections 64 and 65, Read 15 November 2026.
  5. South African Revenue Service, How to verify Tax Compliance Status, Last updated 19 August 2026.
  6. Durban International Convention Centre, Request for quotation BS 08/2025: upgrade of Durban Exhibition Centre Hall 2 West evaporative condenser unit, Closing date 17 February 2025.
  7. Cape Town International Convention Centre, RFQ 013/2026: provision of archiving and storage solutions to the CTICC, Closing date 19 May 2026.
  8. Cross-Border Road Transport Agency, RFQ 28-01-2025: procurement of backup tapes, cleaning tapes and labels, Closing date 5 February 2025.
  9. Localisation Support Fund NPC, Request for quotation RFQ_24_012: feasibility study on local garment manufacturing, Issued 3 May 2024.
  10. Nelson Mandela Bay Stadium, RFQ NMBS099: full mechanical vehicles and machinery repairs and services, Requested 4 September 2026.
  11. George Municipality, Bid ENG006/2024: tender for the ad hoc hire of vehicles, plants and equipment, if and when required, until 30 June 2027, Closing date 10 May 2024.