What is a grader, and how big a blade do you need?

Motor grader: a wheeled machine with a long blade, the mouldboard, set between its front and rear axles, that creates a flat surface and is commonly used to build and maintain dirt and gravel roads.[6]

Also called Grader, Road grader, Blade

  • A motor grader carries its blade between the axles, can carry a ripper at the rear, and on many models bends in the middle. One maker's 2025 South African guide lists seven models from 15,150 kg with a 3,710 mm blade to 47,990 kg with a 5,490 mm blade.
  • CSIR settlement guidelines list blading among the routine maintenance activities for unpaved streets, beside watering, patch gravelling and cleaning side drains, and say the frequency of maintenance on gravel streets increases with traffic.
  • On a construction site the contractor must ensure the grader operator is trained, certified competent, authorised in writing and medically fit, and that a grader travelling or working on a public road complies with the National Road Traffic Act, 1996.

Need one?TLB hire with an operatorPlant hire

Headcore6 sources

What work do you need done?

What does a motor grader do?

A motor grader is a form of heavy equipment with a long blade used to create a flat surface. A typical grader has three axles: the steering wheels in front, then the blade or mouldboard, then a cab and engine above tandem rear axles, and many models allow frame articulation between the front and rear axles. Some carry optional rear attachments such as a ripper, scarifier or compactor. Most modern graders are self-propelled, which is why they are technically "motor graders".[6]

The same reference lists the work: constructing and maintaining dirt and gravel roads, producing canted surfaces for drainage or safety, cutting shallow V-shaped drainage ditches beside highways, and finish grading, with a blade whose angle, tilt and height can be set to a high level of precision. Rough grading, in its terms, is done by machines such as bulldozers and wheel tractor-scrapers; see bulldozer.[6]

One district municipality's tender shows how a grader is hired in South Africa. Cape Winelands District Municipality's plant hire tender T 2025/015, which closed on 19 March 2025, asked for rubber-tyred road graders with an operator and wanted each offer to say whether the machine is articulated or rigid and whether it carries a ripper and scarifier. Hire rates and what a quote must cover are in grader hire.[4]

What size of grader do I need?

One maker's 2025 South African product guide lists the blade length and operating weight, with the rear ripper or scarifier included, of seven graders; the guide does not group them, and this page splits them into three groups by weight. The Cape Winelands tender sets three weight classes, each split by year of manufacture: 5 to 13 tonnes, 13 to 17 tonnes and 17 to 20 tonnes in its specification, with the third class printed as 17 to 25 tonnes in its price schedule.[3][4]

What size of grader do I need?
GroupOperating weightBlade lengthFlywheel powerTop forward speedRear ripper
Smaller (3 models)15,150 to 18,730 kg3,710 to 4,320 mm101 to 163 kW43.4 to 44.3 km/h3 or 5 shanks; two models add 9 scarifier shanks
Medium (3 models)22,150 to 33,310 kg4,320 to 4,878 mm194 to 216 kW44.9 to 47.9 km/h5 or 7 shanks
Large (1 model)47,990 kg5,490 mm311 kW44.4 km/h5 shanks

Sources:[3]

Why do gravel streets need routine blading?

Gravel streets need frequent grading. The CSIR's Guidelines for Human Settlement Planning and Design name the most common causes of poor performance of gravel streets: slipperiness and potholing when wet, and excessive dust and ravelling when dry. They say frequent maintenance, for example grading, watering and the addition of material, is necessary, and that its frequency increases with increasing traffic.[5]

The guidelines' table of street maintenance lists watering, blading, patch gravelling and cleaning side drains and ditches among the routine maintenance activities for unpaved streets, with regravelling as periodic maintenance, and they say the length of unpaved street directly determines the watering and blading workload of a maintenance zone. They also note that the period since a road was last bladed influences how much dust it produces, and they put the usual thickness of a gravel wearing course at a standard 150 mm.[5]

What rules apply to a grader on a South African site?

On a construction site a grader is mobile plant under the Construction Regulations, 2014 (GN R. 84), defined as "any machinery, appliance or other similar device that is able to move independently, and is used for the purpose of performing construction work on a construction site", and the construction or maintenance of a road is construction work. Under regulation 23(1)(d) the contractor must ensure the operator "has received appropriate training, is certified competent and in possession of proof of competency and is authorised in writing", and holds a medical certificate of fitness from an occupational health practitioner in the form of Annexure 3.[1]

The contractor must also ensure that the grader has a structure protecting the operator from falling material or from being crushed if it overturns, an acoustic warning device and an automatic acoustic reversing alarm, and that the authorised operator inspects it daily before use against a checklist, with the findings recorded in a register kept in the machine (regulation 23(1)(h) to (k)). A grader travelling, working or operating on a public road must comply with the National Road Traffic Act, 1996 (regulation 23(2)(j)). The text read is the current one: the 2025 draft construction regulations are not final.[1]

On a mine, a self-propelled grader used for mining, transport or associated operations is a trackless mobile machine under regulation 8.10 of the Mine Health and Safety Regulations (GN R. 125 of 2015), which counts machines that move on wheels. The employer must take reasonably practicable measures to ensure that operators are assessed as competent, authorised in writing by the responsible engineer and their supervisor, and issued a licence they carry (8.10.23 and 8.10.27), and that a pre-use checklist is completed at the beginning of every shift (8.10.24.2). Regulations 8.10.23 and 8.10.27 do not apply to a machine licensed under what the regulation calls the "National Road Transportation Act 2000" and not used for primary mining activities (8.10.28).[2]

A worked example

A buyer re-spreading a 150 mm gravel wearing course, the standard thickness the CSIR guidelines give, over a road 1,000 m long and 6 m wide has 0.15 x 6 x 1,000 = 900 m³ of layer to shape. No grader in the 2025 guide has a blade as long as 6 m (the longest is 5,490 mm), so the width takes at least two passes. The road length, width, layer thickness and gravel source are what a supplier needs to price the work, so the request states them rather than naming a machine.[5][3]

Questions buyers ask

What is the difference between a grader and a bulldozer?

Rough grading is done by machines such as bulldozers and wheel tractor-scrapers; a grader runs on tyres with its blade between the axles and is used to finish grade. In the 2025 guide the graders travel at up to 47.9 km/h forward and carry blades of 3,710 to 5,490 mm. See bulldozer.[6][3]

Does a grader have a ripper?

A rear ripper, and on some models a scarifier, is an optional rear attachment. The 2025 guide lists every one of its seven graders with a rear ripper, of 3, 5 or 7 shanks, and two of them also with 9 scarifier shanks. The Cape Winelands tender asks each offer to say whether the grader has a ripper and scarifier.[6][3][4]

Is a motor grader the same as a road grader?

Yes in practice. Most modern graders are self-propelled and so technically "motor graders", and the Cape Winelands tender calls the category "road grader". Both names mean the wheeled machine with the blade between its axles.[6][4]

Does a grader operator need a licence in South Africa?

On a construction site, regulation 23(1)(d) of the Construction Regulations, 2014 asks for training, proof of competency, written authorisation and a medical certificate of fitness. On a mine, regulation 8.10.23 of the Mine Health and Safety Regulations requires assessment, written authorisation and a licence that the operator carries, unless the grader is licensed for the road and not used for primary mining activities (8.10.28).[1][2]

What work do you need done?

Sources

  1. Department of Labour (Government Gazette 37305), Construction Regulations, 2014 (GN R.84): regulations 1 and 23, 7 February 2014.
  2. Department of Mineral Resources (Government Gazette 38493), Mine Health and Safety Act, 1996: Regulations relating to machinery and equipment (GN R. 125), regulation 8.10 Trackless mobile machinery, 27 February 2015.
  3. Komatsu South Africa (Pty) Ltd, Product guide, Southern Africa (motor graders), September 2025.
  4. Cape Winelands District Municipality, Tender T 2025/015: the hiring of mechanical and construction plant equipment for the period ending 30 June 2028 (specification and pricing schedules), Closing date 19 March 2025.
  5. CSIR (for the Department of Housing), Guidelines for Human Settlement Planning and Design, Volume 2, Chapter 8: Roads: materials and construction (unpaved streets), PDF of 22 October 2009.
  6. Wikipedia, Grader, Last edited 31 July 2026.