What are the types of scaffolding used on South African sites?

Scaffold: a temporary raised platform and supporting structure used to give access to, and support, workers or materials or both; the Construction Regulations, 2014 count it among temporary works.[1]

Also called Access scaffolding, Scaffolding

  • South African sources name tube-and-fitting and system scaffolds, then sort by form: putlog, interlocking, free-standing tower, walk-through frame, independent, birdcage, cantilever and hanging.
  • The regulations treat a suspended platform separately: regulation 17 requires a certificate of system design from a professional engineer, certificated engineer or professional technologist, and an operational compliance plan.
  • Regulation 16 does not name a type. It asks for a written competent person and for compliance with the incorporated standard, which the 2017 guidelines read as SANS 10085.

Need one?Scaffolding hirePlant hire

Headcore10 sources

Tell us what scaffolding you need

What types of scaffolding are there in South Africa?

South African sources name two construction methods and then a longer list of forms. The SABS abstract of SANS 10085-1:2024 says the standard covers steel tube and fitting type scaffolding and steel system type scaffolding, used for providing safe access and for supporting people, materials, small plant and equipment in construction, maintenance and demolition work.[5]

The SAQA unit standards for scaffold erectors list the types a trainee must identify and describe according to SANS 10085: putlog, interlocking, free-standing tower (mobile and static), walk-through frame, and tubular or system. They add access towers, independent scaffolds, mobile and static, and birdcage scaffolds as the systems a trainee erects, and drop or hanging scaffolds, cantilever platforms and medium duty independent scaffolds with bridging and a protection fan as the further range.[6][7]

A pricing schedule for scaffolding services on the National Treasury eTenders portal asks for rates for five types: static tower, independent, mobile, barricade and hanging scaffolds. None of the South African sources read for this page sorts scaffolding into exactly three types.[9]

Each unit standard also sorts the platform by load, in four classes: very light, light, medium and heavy. A scaffold is therefore described by its form and by its load class, which is what a hire request should state.[6][7]

What do South African sources attach to each type?

South African sources attach different checks and limits to each form. The table gives what they say, not a general ranking.[6][7]

What do South African sources attach to each type?
TypeHow South African sources describe itWhat they attach to it
Tube-and-fitting and systemThe two steel methods the SANS 10085-1:2024 abstract covers; the unit standards list tubular or systemAccess, and support for people, materials, small plant and equipment, in construction, maintenance and demolition
Putlog and interlockingListed by the unit standards as putlog and interlockingNo further description in the unit standards, which ask for each type to be described in relation to its application according to SANS 10085
Free-standing tower, static or mobileListed by the unit standards as free-standing tower, mobile and static; Rustenburg Local Municipality's 2025 inspection list asks for a correct height to base ratio and outriggers used or tied to the structure where necessaryFor a mobile tower: wheels and swivels in good condition and brakes working and applied
Walk-through frameListed by the unit standards as walk through frameNo further description in the unit standards
Independent and birdcageIndependent scaffolds, mobile and static, and birdcage scaffolds are the systems a trainee erectsIndependent scaffolds are also priced in a pricing schedule on the National Treasury eTenders portal; a medium duty independent scaffold with bridging for two bays and a protection fan is part of the erector range
Hanging (drop) and cantileverDrop or hanging scaffold and cantilever platform sit in the erector rangeHanging scaffolds are priced on separate lines (static tower, independent and barricading tower) in a pricing schedule on the National Treasury eTenders portal
Suspended platformA working platform suspended from supports by one or more separate ropes from each supportRegulation 17: a certificate of system design from a professional engineer, certificated engineer or professional technologist

Sources:[5][6][7][8][9][1]

What does the law say about the type of scaffold you use?

The Construction Regulations, 2014 (GN R. 84) do not pick a type. Regulation 16(1) makes a contractor "appoint a competent person in writing" who must ensure that scaffolding work runs under his or her supervision and that "all scaffold erectors, team leaders and inspectors are competent to carry out their work".[1]

Regulation 16(2) adds that access scaffolding, when in use, must comply "with the safety standards incorporated for this purpose into these Regulations under section 44 of the Act". The regulation names no standard number. The Department of Labour's 2017 guidelines add the note "Scaffolds must comply with SANS 10085", The SABS lists SANS 10085-1:2026 (Ed. 2.01), approved 12 August 2026, as the current version of part 1, replacing the 2024 second edition.[1][2][4]

A scaffold is also temporary works, so regulation 12(1) applies: the contractor must appoint a temporary works designer in writing "to design, inspect and approve the erected temporary works on site before use". The 2017 guidelines read the design of scaffolds, for regulation 12, as design in terms of SANS 10085. A suspended platform is different: regulation 17(2) bars its use without a certificate of system design issued by a professional engineer, certificated engineer or professional technologist, and an operational compliance plan.[1][2]

The department published draft Construction Regulations for comment on 12 March 2025. Their draft regulation 16 would keep only the duty to comply with the incorporated standard. No final regulations had been published by November 2026, so the 2014 regulations still apply.[3]

What should you tell a scaffolding company when you choose a type?

In practice, state the form (for example a static independent scaffold or a mobile tower), the load class, the height and the length of face, and name who erects and who inspects. A Reserve Bank tender specification requires scaffolding to follow SANS 10085 for the type and height required and, where applicable, to be designed by a temporary works designer.[10]

Ask for the scaffolding hire quote to name the competent person under regulation 16(1). The scaffold hire or buy guide covers pricing and the hire agreement, and scaffold inspection and tagging covers inspection; the scaffold tag page explains the green, yellow and red tags.[1]

A worked example

For illustration: a contractor needs access along one wall of a factory for four weeks of gutter work and picks a static independent scaffold in the light load class. Scaffolds are temporary works, and regulation 12(3)(f) asks for temporary works to be inspected by a competent person after inclement weather or any other imposed load and at least on a daily basis until removed, with the results recorded in a register on site. Over four weeks the register should therefore show daily entries, not only the four that a weekly interval, such as the one in Rustenburg Local Municipality's 2025 tender, would produce.[1][8][6]

Questions buyers ask

What are the three types of scaffolding?

No South African source read for this page counts three. The SABS abstract of SANS 10085-1:2024 covers two methods, steel tube and fitting and steel system scaffolding. A pricing schedule on the National Treasury eTenders portal lists five forms: static tower, independent, mobile, barricade and hanging.[5][9]

Does scaffolding need an engineer's design?

The regulations do not tie it to a type. Regulation 12(1) requires a temporary works designer, appointed in writing, to design, inspect and approve the erected temporary works before use, and a Reserve Bank specification asks for one where applicable. A suspended platform also needs a certificate of system design from a professional engineer, certificated engineer or professional technologist (regulation 17(2)(b)).[1][10]

Is a suspended platform a type of scaffold?

The regulations treat it separately. Regulation 1 defines a suspended platform as a working platform suspended from supports by one or more separate ropes from each support, and regulation 17 governs it apart from scaffolding in regulation 16, with its own certificate of system design and operational compliance plan.[1]

Which standard do South African scaffolds follow?

SANS 10085-1, whose current edition is SANS 10085-1:2026 (Ed. 2.01), approved 12 August 2026. Regulation 16(2) refers to the standards incorporated under section 44 of the Occupational Health and Safety Act without naming a number, and the 2017 guidelines say scaffolds must comply with SANS 10085.[1][2][4]

Tell us what scaffolding you need

Sources

  1. Department of Labour (Government Gazette 37305), Construction Regulations, 2014 (GN R. 84), 7 February 2014.
  2. Department of Labour (Government Gazette 40883), Construction Regulations, 2014: Guidelines (GN 489), 2 June 2017.
  3. Department of Employment and Labour (Government Gazette 52267), Draft Construction Regulations: invitation of public comments (GN 5983), 12 March 2025.
  4. SABS Standards Division, SANS 10085-1:2026 (Ed. 2.01), The design, erection, inspection, use, modification and dismantling of steel access scaffolding and working platforms, Part 1: General (store entry), 12 August 2026.
  5. SABS Standards Division, SANS 10085-1:2024 (Ed. 2.00), The design, erection, inspection, use, modification and dismantling of steel access scaffolding and working platforms, Part 1: General (store entry and abstract), Approved 18 September 2025.
  6. South African Qualifications Authority, Unit standard 263247: Assist to erect, use and dismantle access scaffolding, Registered 1 July 2018 to 30 June 2023; last date for enrolment 30 June 2029.
  7. South African Qualifications Authority, Unit standard 263245: Erect, use and dismantle access scaffolding, Registered 1 July 2018 to 30 June 2023; last date for enrolment 30 June 2029.
  8. Rustenburg Local Municipality, Contract RLM/DCD/0027/2025/26: repairs and maintenance of municipal buildings and facilities for 36 months (bills and health and safety specification), Closing date 15 December 2025.
  9. National Treasury eTenders portal (pricing schedule; the document names no issuer), Scaffolding services: minimum call-out rates, labour and scaffolding material, three months' expected utilisation, undated, read November 2026.
  10. South African Reserve Bank, Annexure K1: Construction health and safety tender specification, GW176 SARB head office extension (demolitions), Revision December 2021.