Bobcat hire: how to hire a skid steer loader of any make
Describe the work, the ground and the attachment you need. Headcore puts your request in front of companies that hire out skid steer loaders and serve your area, and each decides whether to respond.
Free to post. Nothing reaches suppliers until you review and post it.
- Reaches matching companies within minutes
- Anonymous to suppliers until you choose to reveal
- You choose who to talk to
What details help?
All optional. Mention what you know.
- The machine. TLB, excavator, grader, roller or tipper, and roughly what size, if you know.
- With or without an operator. Whether you need an operator, fuel and transport to site, or the machine on its own.
- How long. Days or weeks, and the date you need it on site.
- The site. The town, access for a truck or lowbed, and the ground conditions.
See an example request
Illustrative, not a real request.
We need a skid steer loader with an operator for three days to clear rubble from a yard and load it onto trucks.
- Soft ground after rain, gate about 2.5 m wide
- Bucket and pallet forks, site near Pietermaritzburg, KwaZulu-Natal
How Headcore helps with skid steer hire
Keep your usual hire company in the mix. Headcore helps you find additional companies that can do this work.
- 01
Describe the work
Start in your own words: what must be moved or levelled, the ground, the attachment and how long. You review the request before anything is posted.
- 02
Reach skid steer hire companies
Companies that hire out skid steer loaders and serve your area see the request. Each decides for itself whether to respond.
- 03
Choose who to speak with
Compare how they would approach it, reveal your company only to the ones you choose, and deal with them directly.
Before you hire a skid steer
The work and the load
Say what the machine must lift or carry and over what height, for example loading a truck. The load decides the size of machine, and a hire company cannot size it without it.
Wheels or tracks
Say how the ground is: paved, or muddy, uneven or soft. It decides between tyres and tracks.
The attachment
A bucket is the usual start. Name any other tool, such as forks, a broom or an auger, because some tools need more hydraulic power than others.
Wet or dry, by the hour or the day
Say whether the rate must include the operator and the fuel, and whether you want an hourly or a daily rate. Responses that differ on these cannot be compared.
Access
Give the narrowest gate and the lowest overhead clearance on the way in, and say how the machine will arrive on site.
In short
A request for "bobcat hire" is a request for a skid steer loader, and a skid steer of any make can do the work. One district municipality hired them wet, with the operator and fuel in an hourly rate. One maker says tracks suit muddy, uneven or soft ground and tyres suit paved surfaces. Name the attachment in the request.
What does bobcat hire cover?
One South African distributor's 2022 article says the skid steer is "also commonly referred to as a 'bobcat loader' or a 'skid loader'". The maker of that brand asks that its name not be used as a generic term for skid-steer loaders, so this page says skid steer loader: a hire request should name the size and the work, and a skid steer loader of any make can do it.[4][5]
Wheels or tracks, and which attachment?
A district municipality's plant hire request closing on 19 March 2025 listed skid steer loaders as their own category. It asked for pneumatic tyred machines, with five classes by operating weight from 1 ton to 1.499 ton up to 3 tons and above, and with attachment prices included in the rate. One maker's buyer guide supplies the rest of the table. What the machine is, how it steers and what its rated operating capacity means are on the skid steer loader page.[1][6]
| What to settle | What the sources state | What to say in a request |
|---|---|---|
| Wheels or tracks | One maker's guide says track undercarriages are better on muddy, uneven or soft terrain, with superior traction and lower ground pressure, and that machines on tyres, like skid steers, suit paved surfaces, with faster movement and easier maintenance. It lists tracked machines as compact track loaders and says that, compared with skid steers, they have low ground pressure, which helps reduce damage to lawns and soft soil. | The ground after rain, and whether the surface must not be marked. The municipal request listed tyred machines only, so ask for a compact track loader by name if you need tracks. |
| Size | The municipal request hired by operating weight, in five classes from 1 ton to 3 tons and above. One maker's guide says small-frame models generally have lower rated operating capacities and larger frames higher ones; model weights and capacities are on the skid steer loader page. | The heaviest load and the narrowest gate, so the hire company can offer a class that carries the load and fits the way in. |
| Attachment | The municipal request listed a sweeper, augers, a backhoe, bale forks, mowers, scarifiers, snow pushers and blades, and a stump grinder. One maker says standard auxiliary hydraulics power the most common attachments, such as augers, grapples, sweepers and trenchers, and that stump grinders need high-flow hydraulics. | The tool by name, and whether the machine offered has the hydraulics for it. A bucket is the default. |
| Changing attachments | One maker describes two coupler types: hydraulic couplers, which change an attachment quickly, and manual couplers, which require the operator to leave the cab to secure it. | Whether you need to switch between, say, a bucket and forks during the day, and who does it. |
Is skid steer hire charged by the hour or by the day?
Usually, ask every response for the same kind of rate. The district municipality's request priced its skid steers with a wet rate, defined as the dry rate plus the diesel rate per hour and including the operator, fuel, plant and maintenance, with a standby rate and an establishment rate per kilometre alongside. The attachment prices were included in the rate.[1]
The same request counts the 8-hour shift, standby and downtime the same way for every machine it hires, as the article on TLB hire rates sets out; its skid steer schedule asked for hourly wet and standby rates, not a day rate.[1]
Ask each response whether it charges by the hour or by the day, what the minimum hours are, what counts as standby, whether the attachment is in the rate, and what any dry rate leaves out.[1]
Will a skid steer fit my site, and how does it arrive?
Usually, the width decides it. One maker's guide says overall width is measured from the outside of one track or tyre to the other, that the total width with the bucket or attachment matters for transport and storage, and that overall height and turning radius affect access and moving in tight spaces. Give your narrowest gate and lowest overhead clearance, and ask each response for the machine's width and height with the attachment fitted.[6]
The guide says wider tracks or tyres give lower ground pressure, which suits muddy or sensitive surfaces, and that the machine's operating weight affects its ground pressure and floatation, so compare the operating weights of the machines offered. Ask whether the machine arrives on a trailer or a truck, who loads and unloads it, and whether delivery and collection are in the rate.[6]
In the district municipality's request, moving plant from the hire company's premises to the site and back was paid through an establishment rate per kilometre on a one-way basis, so delivery appeared as its own line.[1]
Who may operate a hired skid steer on site?
On a construction site the Construction Regulations, 2014 require mobile plant to be operated by a person who "has received appropriate training, is certified competent and in possession of proof of competency and is authorised in writing", and who has a medical certificate of fitness from an occupational health practitioner in the form of Annexure 3 (regulation 23(1)(d)).[2]
The skid steer loader page sets out what regulation 23(1)(h) to (k) requires of the machine itself: a structure protecting the operator, warning devices and a daily inspection against a checklist, recorded in a register kept in the machine. Say in the request whether you supply the operator or the hire company does, and ask for the operator's papers.[2]
If forks will be fitted, ask which lifting machine certificate the operator holds. The skid steer loader page explains how the 2024 National Code of Practice for training providers of lifting machine operators treats fork attachments under code F11; the Code does not name a skid steer, and clause 14.5 requires a valid certificate of competence and a carry card for equipment it covers.[3]
Sources
- Cape Winelands District Municipality, Tender T 2025/015: the hiring of mechanical and construction plant equipment for the period ending 30 June 2028 (specification and pricing schedules), Closing date 19 March 2025.
- Department of Labour (Government Gazette 37305), Construction Regulations, 2014 (GN R.84): regulation 23, 7 February 2014.
- Department of Employment and Labour (Government Gazette 51711), Incorporation of the National Code of Practice for the Training Providers of Lifting Machine Operators, 2024, into the Driven Machinery Regulations 2015, 6 December 2024.
- AFGRI Equipment (South Africa), John Deere Skid Steers in South Africa, 27 October 2022.
- Bobcat Company Europe, Trademark, Read 19 November 2026 (page copyright 2026).
- Bobcat Company (North America site), Compact Track Loader & Skid-Steer Loader Sizes, Types & Specifications, Read 19 November 2026 (page copyright 2026).
Last checked: 19 November 2026
How Headcore works
- Posting a request is free.
- Your request goes to companies that do the kind of work you describe.
- A supplier answers with a response that says how they would do the job. You read the responses and decide who to talk to.
Questions buyers ask
What does it cost to post a request?
Posting a request is free. A supplier pays one token when it decides your request is worth answering. What you agree about the work is between you and the supplier.
Who sees my request?
Companies that do this specific work, within reach of your site. They see the job. Whether they also see your company name is your choice: you can stay anonymous until you pick who to talk to.
What if nobody responds?
Your request reaches companies that do this work within minutes. Each decides for itself whether to respond, so we cannot promise responses. If the work cannot wait, contact your usual suppliers as well.
Who brings the machine to site?
Say in your request whether you need it delivered. Many hire companies bring a machine on a lowbed or drive it to site, and some charge for that separately. Suppliers say in their response how they would do it.
What if the job runs longer than planned?
Say in your request whether the dates might move. Extending the hire is agreed between you and the supplier you choose, not with Headcore.
Does Headcore hire out equipment?
No. Headcore is a matching system: it puts your request in front of companies that do this work, and you deal with the supplier directly. Keep your usual suppliers; use Headcore when they cannot help, or when the job is outside what they do.
Does a skid steer come with an operator and fuel?
In the public document used here, yes: skid steers were priced at a wet rate, which includes the operator, fuel, plant and maintenance, with attachment prices included. That document names a dry rate without defining it, so ask what any dry rate leaves out, and say which you want.
Do I need a tracked skid steer on soft ground?
One maker says track undercarriages are better on muddy, uneven or soft terrain, with lower ground pressure, and that tyres suit paved surfaces. Describe the ground after rain and ask the hire company which it would send.
Start with what you know.
A sentence or two is enough. Nothing reaches suppliers until you review and post it.
Start your request