Generator hire for sites, events and power outages

Describe what must run, for how long and where the generator will stand. Headcore puts your request in front of companies that hire out generators and serve your area, and each decides whether to respond.

Free to post. Nothing reaches suppliers until you review and post it.

  • Reaches matching companies within minutes
  • Anonymous to suppliers until you choose to reveal
  • You choose who to talk to
What details help?

All optional. Mention what you know.

  • The machine. TLB, excavator, grader, roller or tipper, and roughly what size, if you know.
  • With or without an operator. Whether you need an operator, fuel and transport to site, or the machine on its own.
  • How long. Days or weeks, and the date you need it on site.
  • The site. The town, access for a truck or lowbed, and the ground conditions.
See an example request

Illustrative, not a real request.

We need a diesel generator for a month to run our site offices, a concrete mixer and a welding machine.
  • Three-phase supply, about 60 kW running load
  • Site near Witbank, Mpumalanga, fuel refilled by us

How Headcore helps with generator hire

Keep your usual hire company in the mix. Headcore helps you find additional companies that can do this work.

  1. 01

    Describe what must run

    Start in your own words: the equipment, the supply it needs, how long and where. You review the request before anything is posted.

  2. 02

    Reach generator companies

    Companies that hire out generators and serve your area see the request. Each decides for itself whether to respond.

  3. 03

    Choose who to speak with

    Compare how they would approach it, reveal your company only to the ones you choose, and deal with them directly.

Before you hire a generator

  • What must run

    List the equipment and its power, in kW or amps, and what must start together. The generator is sized to that, not to a label.

  • Single or three phase

    Say which supply the equipment needs, single or three phase, and at what voltage. If some equipment needs one and some the other, say so: it decides the set and the board.

  • Running hours

    Standby power for outages and a generator that runs for weeks are rated differently. Say how many hours a day and for how long.

  • Connection

    Say whether the generator plugs into your own equipment or must be wired to a building's board through a changeover switch, and who does that.

  • Fuel and noise

    Who supplies and refills the diesel, where it is stored, and whether people work or sleep close to the set.

In short

Size a generator from what must run. The sheets used here rate three-phase sets at 0.8 power factor, so 100 kVA gives 80 kW. Say single or three phase, and whether it runs continuously (prime) or when the supply fails (standby). An alteration to a certified electrical installation needs a certificate of compliance, which only a registered person may issue.

What size generator do you need to hire, in kVA or kW?

Each set below is named by its kVA, while your equipment is rated in kW or amps. The sheets state that all three-phase sets are rated at 0.8 power factor, so kW is 0.8 times kVA: 32 kW on a 40 kVA set. The rows are four sets from one maker's data sheets, at 400 V: the prime power (PRP) and standby (ESP) outputs, and the diesel use at 75% and 100% of the prime rating. Add up what must run and ask each response to size it.[1][2][3][4]

What size generator do you need to hire, in kVA or kW?
Set, at 400 VOutputFuel, size and noise
40 kVAPrime 32 kW (40 kVA), standby 35 kW (44 kVA).7.33 L/h at 75% of prime power, 9.73 L/h at 100%. Dry weight 640 kg open or 960 kg silent, tank 90 L or 120 L, up to 85 dBA open or 65 dBA silent at 7 m with no load.
80 kVAPrime 66 kW (82.5 kVA), standby 73 kW (91 kVA).14.3 L/h at 75%, 19.5 L/h at 100%. Dry weight 960 kg open or 1,227 kg silent, tank 180 L or 220 L, up to 85 dBA open or 70 dBA silent.
150 kVAPrime 120 kW (150 kVA), standby 132 kW (165 kVA).25.2 L/h at 75%, 33.1 L/h at 100%. Dry weight 1,396 kg open or 1,745 kg silent, tank 250 L open or 535 L silent, up to 90 dBA open or 70 dBA silent.
250 kVAPrime 200 kW (250 kVA), standby 220 kW (275 kVA).40.7 L/h at 75%, 55.1 L/h at 100%. Dry weight 2,131 kg open or 2,460 kg silent, tank 440 L or 530 L, up to 90 dBA open or 72 dBA silent.

Prime or standby rating, and single or three phase?

The sheets define prime power as available continuously at variable load, in place of bought power, for an unlimited number of hours a year in accordance with ISO 8528-1, with a 10% overload allowed for one hour in every twelve. They define standby power as emergency power at variable load in the event of a utility power failure, also in accordance with ISO 8528-1. In practice, a set that must run for weeks on a site is a prime-power job, and a set for power outages is a standby job.[2][4]

The sheets state that all three-phase sets are rated at 0.8 power factor and that single-phase sets are rated at 0.8 or 1.0, and they list 380, 400 and 415 V as voltages. So the request has to say single or three phase and the voltage, and the kW of the biggest motor or machine that starts.[2][4]

What do the electrical regulations say about connecting a generator?

They do not name generators. The Electrical Installation Regulations, 2009 define installation work as the installation, extension, modification or repair of an electrical installation, the connection of machinery at the supply terminals of that machinery, or the inspection, testing and verification of electrical installations for the purpose of issuing a certificate of compliance (regulation 1).[7]

Only a registered person may issue a certificate of compliance (regulation 9(1)), and a person who undertakes installation work must ensure that a valid certificate is issued for it (regulation 9(4)).[7]

Where an addition or alteration is made to an electrical installation for which a certificate of compliance was issued before, the user or lessor must obtain a certificate for at least the addition or alteration (regulation 7(4)).[7]

What should a generator hire request include?

Usually, check the municipality's conditions too. The City of Cape Town's page on standby generators says that where a generator will synchronise with or draw from the city's electrical network, an application must be made, and a certified copy of the certificate of compliance submitted after the installation work, before supply is reconnected. Whether or not the generator connects to the network, the page asks for noise, ventilation and air quality to be checked with the city.[8]

The same city's page on dangerous goods says an owner or person in charge of a premises may not store or use a flammable liquid of a danger group (i), (ii), (iii) or (iv) in excess of 200 litres without a flammable substance certificate; it does not say which group diesel is in. Ask the local fire service before storing diesel on site: the page sends anyone storing more than the allowed quantity to the city's fire and rescue service.[9]

If the job is lighting rather than power, a diesel light tower carries its own engine and alternator: one brochure gives a 5 kVA alternator and another sheet a 7.5 kVA alternator.[6][5]

Responses compare well when the request gives these details:

  • What must run: each machine, its kW or amps and phase, and what starts together.
  • The supply: single or three phase, the voltage, and the number of sockets or the board it must feed.
  • The use: running every day for weeks, or standby for power outages, and the hours a day.
  • The connection: plugged in at the machines, or wired to a building through a changeover switch, and who does and certifies that work.
  • Fuel: who supplies and refills the diesel, the tank size you want, and where fuel will be stored on site.
  • Noise: open set or silent canopy, and how close people work or sleep. Sheet noise levels are measured at 7 m with no load.[2]
  • Delivery: the town, the site access for a truck, and a firm, level place to stand a set: the four sheets give dry weights from 640 kg to 2,460 kg.[1][4]
  • Dates and length: the day it is needed, how long, and whether an operator or a service visit is included.

Sources

  1. Tide Power (data sheet hosted by Multilec), 40 kVA diesel generator set, Lister Petter engine: technical data, file dated 28 March 2024 (PDF metadata).
  2. Tide Power (data sheet hosted by Multilec), 80 kVA diesel generator set, Lister Petter engine: technical data, file dated 28 March 2024 (PDF metadata).
  3. Tide Power (data sheet hosted by Multilec), 150 kVA diesel generator set, Lister Petter engine: technical data, file dated 28 March 2024 (PDF metadata).
  4. Tide Power (data sheet hosted by Multilec), 250 kVA diesel generator set, Lister Petter engine: technical data, file dated 28 March 2024 (PDF metadata).
  5. Atlas Copco, HiLight V4 metal halide light tower, product page (Canada), undated (footer © 2026); read November 2026.
  6. Atlas Copco Power and Flow, HiLight light towers, full range brochure (United States), 2024.
  7. Department of Labour (Government Gazette 31975), Electrical Installation Regulations, 2009 (GN R. 242), 6 March 2009 (copy of the Gazette pages hosted by the NIOH).
  8. City of Cape Town, Apply for a standby generator, undated page, read 19 November 2026 (its application form is dated 8 February 2023).
  9. City of Cape Town, Storage of dangerous goods, undated page, read 19 November 2026.

Last checked: 19 November 2026

How Headcore works

  • Posting a request is free.
  • Your request goes to companies that do the kind of work you describe.
  • A supplier answers with a response that says how they would do the job. You read the responses and decide who to talk to.

See how it works

Under two minutes.

Ready to get started?

Start your request

Questions buyers ask

What does it cost to post a request?

Posting a request is free. A supplier pays one token when it decides your request is worth answering. What you agree about the work is between you and the supplier.

Who sees my request?

Companies that do this specific work, within reach of your site. They see the job. Whether they also see your company name is your choice: you can stay anonymous until you pick who to talk to.

What if nobody responds?

Your request reaches companies that do this work within minutes. Each decides for itself whether to respond, so we cannot promise responses. If the work cannot wait, contact your usual suppliers as well.

Does Headcore hire out equipment?

No. Headcore is a matching system: it puts your request in front of companies that do this work, and you deal with the supplier directly. Keep your usual suppliers; use Headcore when they cannot help, or when the job is outside what they do.

What is the difference between kVA and kW on a generator?

The sheets used here give each set's output in both kVA and kW, and rate three-phase sets at 0.8 power factor, so a 100 kVA set gives 80 kW. Give your load in kW and ask the supplier which kVA set carries it.

How much diesel does a hired generator use?

It depends on the load. One maker's sheets give 7.33 L/h for a 40 kVA set and 40.7 L/h for a 250 kVA set, both at 75% of prime power, and less at lighter loads. Say in your request who supplies the fuel.

Can I plug a hired generator into my building myself?

Check the Electrical Installation Regulations, 2009 first. They do not name generators, but they count the modification of an electrical installation and the connection of machinery at its supply terminals as installation work, require a certificate of compliance for an addition or alteration to a certified installation, and let only a registered person issue one. Say in your request whether the generator is wired in, and who does and certifies that work.