Skip to content

Crane truck hire for loading and lifting on site

Describe the load, how far it must reach and the site. Headcore puts your request in front of companies that run crane trucks and serve your area, and each decides whether to respond.

Free to post. Nothing reaches suppliers until you review and post it.

  • Reaches matching companies within minutes
  • Anonymous to suppliers until you choose to reveal
  • You choose who to talk to
What details help?

All optional. Mention what you know.

  • What must be lifted. What it is and roughly how heavy, if you know.
  • Reach and height. How far the load is from where a crane can stand, and how high it must go.
  • Space to set up. Room for the crane, overhead lines, and whether the ground is firm.
  • Where and when. The town, access to the site, and when the work can be done.
See an example request

Illustrative, not a real request.

We need a crane truck to deliver and offload eight steel columns at our building site.
  • Each column about 1.2 tons and 9 metres long
  • Offloading near Polokwane, Limpopo

How Headcore helps with crane truck hire

Keep your usual crane company in the mix. Headcore helps you find additional companies that can do this work.

  1. 01

    Describe the load and the reach

    Start in your own words: what must be lifted, roughly how heavy, and how far from the truck. You review the request before anything is posted.

  2. 02

    Reach crane truck companies

    Companies that run crane trucks and serve your area see the request. Each decides for itself whether to respond.

  3. 03

    Choose who to speak with

    Compare how they would approach it, reveal your company only to the ones you choose, and deal with them directly.

Before you hire a crane truck

  • The heaviest load and its reach

    A loader crane lifts far less at full reach than close in. Give the weight of the heaviest piece and how far it is from where the truck can stand.

  • Loading, offloading or placing

    Say if the crane only moves loads on and off a truck or must set them in place, such as onto a plinth or a roof. The operator's certificate can be limited to the first.

  • Where the truck stands

    Firm ground for the stabilisers, room to extend them, a way in for a truck and any overhead lines near the lift.

  • Papers for the lift

    The crane's latest examination record and the operator's certificate. Say if your site asks for them before the truck arrives.

In short

A crane truck is a truck with a loader crane that carries a load and lifts it on and off. Choose the crane by its load chart at your reach, not by a label such as 8 ton. In South Africa the crane must be examined and tested by a lifting machinery inspector at least every 12 months, and its operator needs a certificate of training.

What is a crane truck, and how does it differ from a mobile crane?

A crane truck is a truck with a loader crane mounted on its chassis, which loads and unloads the truck and other vehicles. One maker says its loader cranes, from 1 to 150 metre tonnes, serve construction, transport logistics, local authorities, waste management and mining, among others. The Driven Machinery Regulations call a machine like this a lifting machine: a power-driven machine designed and built to raise or lower a load or move it in suspension.[7][1]

A mobile crane is a separate machine with its own operator code. The Code of Practice for lifting machine operators lists truck mounted cranes as code C32, up to the capacity specified on the certificate, and hydraulic mobile cranes as C33 up to 50,000 kg and C43 up to 15,000 kg. Training providers must mark each certificate with the machine category, code number and description, so the code shows which machine it covers.[3]

A search for a hiab truck lands here too: the word is the name of a loader crane maker, not a type of truck, and a crane truck can carry any make. Ask suppliers for the crane's make and model rather than the brand.[13]

The size label is loose. A crane truck carries several figures: the truck's own mass and payload, and the crane's lifting moment and maximum lifting capacity. One maker's crane of 22.4 mt, for example, lists a maximum lifting capacity of 8,500 kg. So a label such as 8 ton or 10 ton does not tell you what the crane lifts at your reach.[11][9]

How big is the crane on a crane truck?

The maker lists each loader crane by its maximum lifting moment, in metre tonnes (mt), and its maximum lifting capacity, and builds each model in several boom versions: in these rows, the version with the longer hydraulic outreach has the lower lifting moment. These rows are one maker's published figures for five models. Its pages measure outreach at a boom angle of 20 degrees, so it is not the longest possible reach, and they say the weight of any mechanical extension comes off the chart loads. The crane's own load chart, for your radius, always decides.[8][9][10][11][12]

How big is the crane on a crane truck?
Crane (one maker's model)Lifting moment by boom versionLargest lift and crane weight
PK 6500 Performance, 5.8 mtShortest boom version 5.8 mt, with 5.7 m hydraulic outreach; longest 5.4 mt, with 9.6 m.A maximum lifting capacity of 3,300 kg. The crane weighs 708 kg in the shortest version and 836 kg in the longest.
PK 8500 Performance, 7.6 mtShortest boom version 7.6 mt, with 5.7 m hydraulic outreach; longest 7.2 mt, with 9.6 m.A maximum lifting capacity of 3,300 kg. The crane weighs 875 kg to 1,018 kg. The maker's lifting diagram for the 9.6 m version shows 3,140 kg close in and 720 kg at full hydraulic outreach.
PK 12000 Performance, 11.6 mtShortest boom version 11.6 mt, with 6.2 m hydraulic outreach; longest 10.3 mt, with 14.6 m.A maximum lifting capacity of 6,790 kg. The page says its fast boom extension suits unloading bulky building materials on construction sites.
PK 23502 High Performance, 22.4 mtShortest boom version 21.7 mt, with 8.1 m hydraulic outreach; longest 18.9 mt, with 21.3 m. The page lists 23.3 m with manual extensions.A maximum lifting capacity of 8,500 kg. The crane weighs 2,583 kg to 3,488 kg.
PK 65002 SH High Performance, 62 mtA maximum lifting moment of 62 mt; by boom version, 60.9 mt with 7.6 m hydraulic outreach down to 55.1 mt with 20.4 m.A maximum lifting capacity of 22,000 kg. The crane weighs 5,040 kg in the shortest version and 6,805 kg in the longest without a jib.

What must a crane truck and its operator have on site in South Africa?

The user of a lifting machine may not use it unless it is conspicuously and clearly marked with its safe working load, and where that load varies with the conditions of use, the user must post a table of the safe working load for every condition in a conspicuous place easily visible to the operator (regulation 18(1)(b) of the Driven Machinery Regulations, 2015, GN R. 540). Regulation 18(9) speaks of the safe working load "at that particular radius", so on a crane that table gives the load at each radius.[1]

The entire installation and all its working parts, excluding lifting tackle, must be thoroughly examined and performance tested by a lifting machinery inspector of a lifting machinery entity before they are put into use, every time they are dismantled and re-erected, and then at intervals not exceeding 12 months (regulation 18(5)(a)). A lifting machinery inspector is employed by a lifting machinery entity, which the chief inspector approves and registers, and is registered with the Engineering Council of South Africa. The ropes, chains, hooks, sheaves, brakes and safety devices that form part of the machine need a thorough examination by a competent person at intervals not exceeding six months (regulation 18(6)). A "competent person" has the required knowledge, training and experience and, where applicable, qualifications for the task, and is familiar with the Act and its regulations, as GN R. 913 of 2015 corrected the definition.[1][2]

  • A user of a leased lifting machine must keep on their premises a register with the latest applicable performance test and service records, not older than 12 months (regulation 18(7)(b)).[1]
  • A power-driven lifting machine with a lifting capacity above 5,000 kg needs a load indicator and/or a load-limiting device that stops the driving effort when the load exceeds the safe working load at that radius (regulation 18(9)).[1]
  • The user must see that every lifting machine is operated by an operator trained for that type, who for the machines in the Code of Practice holds a certificate of training from an accredited provider (regulation 18(11)).[1]
  • No person may operate equipment covered by the 2024 National Code of Practice without a valid certificate of competence and a carry card (section 14.5), and a carry card is valid for up to 24 months (section 14.2). Where the only need is for the operator to load and offload road vehicles, the certificate must be limited, either to the holder's employment with the employer that needs it or, the form the Code prefers, "For loading and off-loading road vehicles only" (Appendix 2, note 9).[3]
  • On a construction site, regulation 23 of the Construction Regulations, 2014 (GN R. 84) applies to construction vehicles, defined as vehicles that transport persons or material on and off the site for construction work, and to mobile plant, defined as machinery able to move independently and used for construction work on the site. Regulation 23(1) requires that these are operated by a person who is trained, certified competent, authorised in writing and holds a medical certificate of fitness, and that they are inspected daily against a checklist, with the findings recorded in a register kept in the vehicle or plant (regulation 23(1)(d) and (k)).[4]
  • When such a vehicle or plant is not in use, its booms and similar appendages must be fully lowered or blocked, with the controls in neutral, the motor stopped, the wheels chocked, the brakes set and the ignition secured (regulation 23(2)(f)). Regulation 22 on cranes covers tower cranes only. Regulation 24(a) requires, before construction commences and while it proceeds, adequate steps to find and guard against danger to workers from any electrical cable or apparatus under, over or on the site.[4]

Which driver's licence and permit does a crane truck need?

For a crane truck that is a goods vehicle, the driver's licence follows its gross vehicle mass (GVM), not the crane. Under the National Road Traffic Regulations as restated by GN R. 846 of 2014, code C1 covers a goods vehicle with a GVM above 3,500 kg up to 16,000 kg, and code C covers one above 16,000 kg, each with or without a trailer of up to 750 kg and not an articulated vehicle.[5]

The driver of a goods vehicle with a GVM above 3,500 kg must also hold a professional driving permit (PrDP), with listed exceptions (regulation 115(1)(a) and (2) of the National Road Traffic Regulations, 2000). The crane operator's certificate of competence is a separate paper from the driver's licence and permit, though one person may hold all of them.[6][3]

What should a crane truck request include?

Usually the crane's own weight comes off what the truck can carry: the maker's figures above put the crane alone at 708 kg to 6,805 kg. Ask what the truck can carry with the crane on, not only what the crane can lift.[8][12]

Crane truck responses usually compare well when the request gives these details:

  • What is lifted, the weight of the heaviest piece, its length and how it is rigged, or ask the supplier to say what it would use.
  • How far the load is from where the truck can stand, and how high it must go, at both the pick-up and the set-down.
  • Whether the crane only loads and offloads, or places the load in position.
  • The ground and the room for the stabilisers, any overhead lines, and the way in for a truck.
  • How many loads or hours, the date, and whether the truck must also carry the load from another site.
  • The papers your site asks for: the crane's latest examination record and the operator's certificate and code.
  • Whether the hire is with an operator or dry, and who covers the load and the truck.

Sources

  1. Department of Labour (Government Gazette 38905), Driven Machinery Regulations, 2015 (GN R. 540), 24 June 2015.
  2. Department of Labour (Government Gazette 39253), Driven Machinery Regulations, 2015: correction notice (GN R. 913), 2 October 2015.
  3. Department of Employment and Labour (Government Gazette 51711), Incorporation of the National Code of Practice for the Training Providers of Lifting Machine Operators, 2024, into the Driven Machinery Regulations, 2015 (GN 5526), 6 December 2024.
  4. Department of Labour (Government Gazette 37305), Construction Regulations, 2014 (GN R. 84 under the Occupational Health and Safety Act 85 of 1993), 7 February 2014.
  5. Department of Transport (Government Gazette 38142), Amendment of the National Road Traffic Regulations, 2000 (GN R. 846): driving licence codes, 31 October 2014.
  6. Department of Transport (Government Gazette 20963), National Road Traffic Regulations, 2000 (GN R. 225): regulation 115, 17 March 2000.
  7. PALFINGER Southern Africa, Loader cranes, page footer 2016, accessed November 2026.
  8. PALFINGER, PK 6500 Performance: technical data, accessed November 2026.
  9. PALFINGER, PK 8500 Performance: technical data and lifting capacity diagrams, accessed November 2026.
  10. PALFINGER, PK 12000 Performance: technical data, accessed November 2026.
  11. PALFINGER, PK 23502 High Performance: technical data, accessed November 2026.
  12. PALFINGER, PK 65002 SH High Performance: technical data, accessed November 2026.
  13. Wikipedia, Hiab, accessed November 2026.

Last checked: 19 November 2026

How Headcore works

  • Posting a request is free.
  • Your request goes to companies that do the kind of work you describe.
  • A supplier answers with a response that says how they would do the job. You read the responses and decide who to talk to.

See how it works

Under two minutes.

Ready to get started?

Start your request

Questions buyers ask

What does it cost to post a request?

Posting a request is free. A supplier pays one token when it decides your request is worth answering. What you agree about the work is between you and the supplier.

Who sees my request?

Companies that do this specific work, within reach of your site. They see the job. Whether they also see your company name is your choice: you can stay anonymous until you pick who to talk to.

What if nobody responds?

Your request reaches companies that do this work within minutes. Each decides for itself whether to respond, so we cannot promise responses. If the work cannot wait, contact your usual suppliers as well.

Can I ask for a lifting plan or certificates?

Yes. Say what you need, such as a lifting plan or the crane's inspection papers. Suppliers say in their response whether they can provide it, and you choose who to speak with.

Does Headcore hire out equipment?

No. Headcore is a matching system: it puts your request in front of companies that do this work, and you deal with the supplier directly. Keep your usual suppliers; use Headcore when they cannot help, or when the job is outside what they do.

What does an 8 ton crane truck mean?

It is a loose label. A crane truck has several figures: the truck's mass and payload, and the crane's lifting moment and maximum lifting capacity. One maker's 22.4 mt crane, for example, lists 8,500 kg as its maximum lift. Give the weight of your heaviest piece and its reach, and let suppliers say which truck and crane they would bring.

Is a hiab truck the same as a crane truck?

The word is the name of one loader crane maker, so a hiab truck is a truck carrying that make of crane. A crane truck can carry any make. Describe the lift, not the brand, and ask suppliers for the crane's make, model and load chart for your reach.

Does the driver need a licence for the crane?

The driver needs the driver's licence code for the truck's GVM and, above 3,500 kg, a PrDP. Whoever works the crane needs a certificate of competence and a carry card for a truck mounted crane, code C32. Ask whether the person who drives is also the one who operates the crane.

Need a mobile crane for a heavier lift? See crane hire

Start with what you know.

A sentence or two is enough. Nothing reaches suppliers until you review and post it.

Start your request