What is an excavator, and which size digs what?
Excavator: a machine with a cab and an articulated arm carrying a bucket, mounted on tracks or tyres, that digs trenches and excavations and loads the material into trucks.[11][7][10][4]
Also called Digger, Hydraulic excavator, Tracked excavator, Wheeled excavator
- An excavator digs with an arm and bucket and runs on tracks or tyres. One manufacturer's 2025 South African guide sorts its excavators by operating weight into mini, medium and large sizes, from about 3 t to over 100 t.
- In that guide, size sets the bucket and the depth: 0.10 to 0.28 m³ and 2.76 to 4.16 m for its mini machines, 0.5 to 3.5 m³ and 5.23 to 6.85 m for its medium machines of 12 to 50 t, and 3.5 to 6.7 m³ and 6.91 to 9.48 m for its large machines of 59 to 118 t.
- On a South African site the contractor must ensure the operator is trained, certified competent, authorised in writing and medically fit, that the machine is inspected daily, and that excavation work is supervised by a competent person appointed in writing.
Need one?Excavator hire: wet rate, hoursPlant hire
Headcore13 sources
Tell us what plant you need
What does an excavator do, and how do tracked and wheeled machines differ?
An excavator digs with an articulated arm that carries a bucket, and the same arm loads the spoil onto a truck. One construction safety site describes excavators as machines with a chassis housing a cabin for driver and operator and an articulated arm, mounted either on tracks or on single or twinned tyres, with outriggers on tyre-mounted 4x4 machines to stabilise them. A TLB differs: it carries a loader bucket at the front as well as its digging arm.[11][4]
Track shoes are part of the specification. One manufacturer's South African guide lists standard shoe widths of 300 to 700 mm across its range, and 600 to 700 mm on its large machines. A wider shoe lowers ground pressure: that manufacturer's brochure for a 20 t machine gives 55.8 kPa on 500 mm shoes and 36.1 kPa on 800 mm shoes, so ground conditions belong in a request.[4][5]
An excavator works through attachments as well as its bucket. Hydraulic breakers, augers and grapples all run on the machine's auxiliary hydraulic circuits, and one South African auger maker sizes its auger ranges by excavator weight, from 0.75 to 1 t machines up to 17 to 45 t machines, drilling to depths of 12 m with extensions. A machine's brochure also lists a breaker mode and a two-way attachment mode in its working-mode settings.[13][12][5]
What size of excavator do I need?
Excavators are sized by operating weight, and bucket size and digging depth broadly rise with it. The classes, weights, buckets and depths below are those of one manufacturer's South African product guide of September 2025, which sorts its excavators into mini, medium and large sizes, with an ultra size of mining shovels and backhoes above 200 t. The uses come from South African municipal hire documents and manufacturer and distributor pages, and the maximum digging depth changes with the arm fitted.[4][5]
| Class | Operating weight | Standard bucket (SAE heaped) | Maximum digging depth | What the source says it is used for |
|---|---|---|---|---|
| Mini | 3,140 to 8,395 kg | 0.10 to 0.28 m³ | 2.76 to 4.16 m | Confined construction sites, trenching and utility installation (a 1.7 t machine); commercial construction, earthmoving, utility installation and site development (an 8 t machine) |
| Medium | 12,380 to 49,600 kg | 0.5 to 3.5 m³ | 5.23 to 6.85 m | General housekeeping on a landfill site no longer in use (20 t); excavating soft and hard material 0 to 3 m deep and laying pipe culverts, with other plant (30 t); quarry work and loading dump trucks with blasted rock, with a quarry bucket and cab (44 t) |
| Large | 59,200 to 118,400 kg | 3.5 to 6.7 m³ | 6.91 to 9.48 m | Loading dump trucks: the guide matches its 59 t and 79 t machines to trucks of 27.3 t and 40 t payload, and its largest machine in this class to trucks of 92 t payload |
What should a request for an excavator specify?
The arm and the bucket set what a machine reaches and moves, so name the deepest cut and the material. One manufacturer's brochure for Africa for a 20 t class machine shows how much the arm matters: three arm lengths give maximum digging depths of 5,230, 6,000 and 6,515 mm, and the heaped bucket options run from 0.80 to 1.20 m³.[5]
Municipal documents show how a buyer words the rest. Bergrivier Municipality's request for a 20 t machine, closing on 6 December 2023, asked for a wet rate per hour covering the operator and fuel, with a minimum of 8 hours a day, a separate line for transport from the depot and back, a working hour meter, and a stated size: a named 20 t reference model of 2009 or newer, or equivalent, with at least 110 kW of net power. It required the machine within five working days of the order, with a penalty of R750 a day after that. For smaller machines and what a quote itemises, see mini excavator sizes; for the wider range of machines on site, see plant hire.[9]
Drawing on those documents and the sizes above, a request for an excavator can name:[9][5][4]
- the deepest cut, the width of the access and the material, so the supplier can pick the class and the arm;[5][4]
- tracks or tyres, and the shoe width where the ground is soft;[11][4][5]
- any attachment, such as a breaker, auger or grab, and whether the machine has the auxiliary hydraulics for it;[13][5]
- whether the rate is wet, covering the operator and fuel, the minimum hours a day, transport to and from site, and how hours are read from the hour meter;[9]
- the operator's proof of competency, written authorisation and medical certificate of fitness.[1]
What rules apply to an excavator on a South African site?
An excavator used on a construction site fits the Construction Regulations, 2014 (GN R. 84) definition of mobile plant: "any machinery, appliance or other similar device that is able to move independently, and is used for the purpose of performing construction work on a construction site", and construction work includes "the moving of earth, clearing of land, the making of excavation". Under regulation 23(1)(d) the contractor must ensure the operator "has received appropriate training, is certified competent and in possession of proof of competency and is authorised in writing", and has a medical certificate of fitness from an occupational health practitioner in the form of Annexure 3.[1]
The machine itself must have a structure protecting the operator from falling material or from being crushed if it overturns, an acoustic warning device and an automatic acoustic reversing alarm, and the contractor must ensure the authorised operator inspects it daily before use against a checklist, with the findings recorded in a register kept in the machine (regulation 23(1)(h) to (k)). When it is not in use, buckets and booms must be fully lowered or blocked, controls neutral, motor stopped, wheels chocked, brakes set and ignition secured (regulation 23(2)(f)), and plant travelling or working on a public road must comply with the National Road Traffic Act, 1996 (regulation 23(2)(j)).[1]
The digging has its own duties under regulation 13. Excavation work must be supervised by a competent person appointed in writing, who must inspect every excavation daily before each shift, after rain and after an unexpected fall of ground, and record the results in a register kept on site. The contractor must also ascertain, as far as reasonably practicable, the location and nature of electricity, water, gas and similar services, and must keep loads, material and plant away from an excavation's edge where they may cause a collapse, unless shoring or bracing prevents it.[1]
The Driven Machinery Regulations, 2015 (GN R. 540) exclude "a mobile earth-moving machine" from their definition of "lift truck"; where the 2024 National Code of Practice for lifting machine operators covers the equipment, such as an excavator with a fork or grab attachment, clause 14.5 requires "a valid certificate of competence and a carry card".[2][3]
A worked example
A buyer loading dump trucks can read one manufacturer's 2025 South African guide, which matches its machines to dump trucks with payloads of 27.3 t and 40 t. At a 1.8 t/m³ material density and a 95 percent bucket fill factor, a machine of 44.3 t with a 1.3 to 2.8 m³ bucket loads the smaller truck in 8 passes and the larger in 11, while a machine of 49.4 t with a 3.5 to 4.58 m³ bucket needs 5 passes and 7. The guide calls the pass counts indicators that are site specific, so a request should state the truck size and ask the supplier to confirm the passes for its machine.[4]
Questions buyers ask
What is the difference between an excavator and a TLB?
A TLB is a backhoe loader: a bucket at the front for loading and a backhoe at the rear for digging trenches, on 4x2 or 4x4 wheels. An excavator has a digging arm and bucket on a chassis that runs on tracks or tyres, and no loader bucket. For the wheeled machine, see the TLB page, or TLB hire if a backhoe loader is what the job needs.[11]
What does operating weight mean?
It is the machine's weight in working trim. One manufacturer's brochure for Africa defines it as including the boom, arm, a heaped bucket, the rated capacity of lubricants and coolant, a full fuel tank, the operator and standard equipment (ISO 7451 heaped bucket rating).[5]
Does an excavator operator need a licence?
The Construction Regulations, 2014 ask for training, proof of competency, written authorisation and a medical certificate of fitness (regulation 23(1)(d)). Where the 2024 National Code of Practice for lifting machine operators covers the equipment, such as an excavator with a fork or grab attachment certificated under code F11, clause 14.5 also requires "a valid certificate of competence and a carry card".[1][3]
How deep can an excavator dig?
It depends on the class and the arm. One manufacturer's 2025 South African guide gives maximum digging depths of 2.76 to 4.16 m for its mini machines, 5.23 to 6.85 m for its medium machines of 12 to 50 t, and 6.91 to 9.48 m for its large machines of 59 to 118 t. On one 20 t machine's brochure, the longest of three arms takes the depth from 5.23 m to 6.52 m.[4][5]
Tell us what plant you need
Sources
- Department of Labour (Government Gazette 37305), Construction Regulations, 2014 (GN R.84): regulations 1, 13 and 23, 7 February 2014.
- Department of Labour (Government Gazette 38905), Driven Machinery Regulations, 2015 (GN R. 540), 24 June 2015.
- Department of Employment and Labour (Government Gazette 51711), Incorporation of the National Code of Practice for the Training Providers of Lifting Machine Operators, 2024, into the Driven Machinery Regulations 2015, 6 December 2024.
- Komatsu South Africa (Pty) Ltd, Southern Africa product guide 2025: excavators (mini, medium and large size) and truck matching, September 2025.
- Komatsu Ltd (brochure for Africa), PC210-10M0 and PC210LC-10M0 hydraulic excavator brochure, March 2022 (EENSB12400 03/2022).
- Komatsu South Africa, PC450-8 and PC450LC-8 crawler excavators, specification sheet (CEN00226-07), February 2017.
- Smith Power Equipment (Kubota distributor in South Africa), Kubota U17-3 Excavator, Read 18 November 2026.
- Smith Power Equipment (Kubota distributor in South Africa), Kubota KX080-3S Excavator, Read 18 November 2026.
- Bergrivier Municipality, Quotation 8/2/58-2023 (MN234-2023): hiring of a 20 ton excavator for housekeeping in Redelinghuys, Closing 6 December 2023.
- Kgetlengrivier Local Municipality, Bid KRLMTEC/BID: 07/2022-2023: provision of construction plant for twenty-five days (30 tonne excavator, wet rate), 30 September 2022; closing 10 October 2022.
- Construction Safety (constructionsafety.co.za), TLB / Excavators (vehicle fitness: machine types), Published 21 February 2019, updated 27 March 2021.
- Auger Torque Africa, Augers and extensions: ranges by excavator weight, Read 18 November 2026.
- DMA Hydraulics & Pneumatics (Pty) Ltd, Hydraulic Systems in Excavator Attachments: Breakers, Augers and Grapples, Read 18 November 2026.