Concrete pump hire: a boom pump or a line pump for your pour

Describe the pour, the reach and the day. Headcore puts your request in front of companies that do concrete pumping and serve your area, and each decides whether to respond.

Post your job. We make the match.

Free. Takes about 2 minutes.

What details help?

All optional. Mention what you know.

  • The pour. Slab, columns or footings, and roughly how many cubes.
  • Reach. How far and how high the concrete must go from where the truck can stand.
  • The day. The date and start time, and who orders the ready-mix.
  • Where and when. The town, access to the site, and when the work can be done.
See an example request

Illustrative, not a real request.

We need a boom pump to pour the first-floor slab of a new office block next Thursday morning, about 40 cubes.
  • The ready-mix is already ordered
  • Midrand, Gauteng

Already have an account? Sign in

How Headcore helps with this pour

Keep your usual pump company in the mix. Headcore helps you find additional companies that can do this work.

  1. 01

    Describe the pour

    Start in your own words: what, how much, when and where. You review the request before anything is posted.

  2. 02

    Reach companies that do this work

    Companies that do concrete pumping and serve your area see the job. Each decides for itself whether to respond.

  3. 03

    Choose who to work with

    The companies that can do it respond. Agree the work with the one you choose, and close the request when you have what you need.

Before you hire a concrete pump

  • What you are pouring

    Give the volume in cubic metres, the day and start time of the pour, and how long you need the pump on site.

  • Boom pump or line pump

    A truck-mounted pump places concrete within the reach of its boom. A towable pump pushes it through a pipeline and an end hose. Describe the pour and let the company say which it would send.

  • Reach and access

    Say how high and how far the concrete must go from where the pump can stand, and how the truck gets in: gate, ground for its outriggers and anything overhead.

  • The mix

    Tell the pump company the mix the ready-mix supplier will send. A guide to pumping concrete encourages trial mixtures to check that a mix can be pumped.

In short

Hire a concrete pump by the pour: the volume, how high and how far the concrete must go, where a truck can stand and the mix. Where a pump truck is mobile plant on a construction site, regulation 23(1)(d) of the Construction Regulations, 2014 requires an employer who performs construction work to ensure that its operator is trained, certified competent, authorised in writing and holds a medical certificate of fitness.

Boom pump or line pump: which does my pour need?

A truck-mounted pump carries a boom with a vertical and a horizontal reach. A towable pump pushes concrete through a pipeline and an end hose. The American Concrete Institute's guide to pumping lists trailer pumps, truck-mounted pumps and separate placing booms, with rigid and flexible pipelines. Each boom pump row is one model from one maker's 2019 brochure, and the pipeline row is one maker's towable pump: examples, not size classes.[2][3][4]

Boom pump or line pump: which does my pour need?
PumpWhat one maker's data givesWhat to tell the company
Truck-mounted boom pump, one maker's 30 m modelVertical reach 30.1 m, horizontal reach 26.5 m, empty weight 18,000 kg, outrigger spread 5,850 mm at the front and 5,000 mm at the rear.Where the truck can stand, with room to open its outriggers, and where the boom must reach.
Truck-mounted boom pump, one maker's 47 m modelVertical reach 47 m, horizontal reach 42 m, empty weight 34,000 kg, outrigger spread 9,300 mm at the front and 9,620 mm at the rear.The same, and whether the gate, the road and the ground take a truck of that weight.
Towable pump with a pipelineMaximum theoretical output 47 m³/h and maximum concrete pressure 97 bar. A DN 150 to DN 125 reducer pipe comes as standard; DN 125 seamless pipelines and a 4 m end hose are options. The page gives no pumping distance.The length and height of the run from where the pump stands, so the company can say how much pipeline and hose it needs.

What should a concrete pump hire request include?

Usually, a company can name a pump when the request gives the pour, the reach, the access and the mix. The American Concrete Institute's guide stresses preconstruction planning for equipment placement and line routing, and encourages evaluating trial mixtures to ensure pumpability and strength. Include:[4]

  • The pour: what is being poured, the volume in cubic metres, the day and start time, and how long you need the pump.
  • The reach: how high and how far the concrete must go from where the pump can stand. One maker's brochure gives each boom pump a vertical and a horizontal reach, 30.1 m and 26.5 m for its 30 m model.[2]
  • The access and the ground: how the truck reaches the pour, the room to open its outriggers and what the ground will bear, since the two boom pumps in the table above weigh 18,000 kg and 34,000 kg empty in their maker's brochure.[2]
  • For a pipeline pump: the length and height of the run and the pipe diameter. One maker's towable pump lists a DN 150 to DN 125 reducer pipe, with DN 125 seamless pipelines and a 4 m end hose as options.[3]
  • The mix the ready-mix supplier will send, so the pump company can say whether it can be pumped.[4]
  • The price basis, and whether each figure includes VAT.

What do the Construction Regulations, 2014 say about a pump on site?

The regulations define mobile plant as "any machinery, appliance or other similar device that is able to move independently, and is used for the purpose of performing construction work on a construction site". Where a hired pump truck is mobile plant, regulation 23(1)(d) requires an employer who performs construction work to ensure that it is operated by a person who "has received appropriate training, is certified competent and in possession of proof of competency and is authorised in writing to operate" it, and who has a medical certificate of fitness issued by an occupational health practitioner in the form of Annexure 3.[1]

Regulation 23(1)(k) has that employer ensure a daily inspection before use by the authorised operator or driver, using a relevant checklist, with the findings recorded in a register kept in the construction vehicle or mobile plant. Regulation 23(2)(f) has it ensure that, when not in use, the "buckets, booms or similar appendages" are "fully lowered or blocked", with the controls in a neutral position, motors stopped, wheels chocked, brakes set and ignition secured. The regulations do not say that a pump truck is mobile plant, so ask the hire company and whoever runs the site which of these duties apply and who holds the operator's proofs.[1]

Where the concrete goes onto temporary works such as formwork, regulation 12(3) requires an employer who performs construction work to ensure, among other things, that the temporary works are inspected by a competent person "immediately before, during and after the placement of concrete" (paragraph (f)), and that "no person may cast concrete, until authorization in writing has been given by the competent person" who erects and maintains them (paragraph (g), referring to paragraph (a)). Ask who that competent person is and when the authorisation will be given, so the pump is not booked before it.[1]

Sources

  1. Department of Labour (Government Gazette 37305), Construction Regulations, 2014 (GN R. 84), 7 February 2014.
  2. SANY Heavy Industry (brochure), Truck-mounted concrete pump (product brochure), Aug. 2019 (printed in the brochure), read 24 November 2026.
  3. Ammann (product page, India site), CPS 50 stationary concrete pump: technical data, Read 24 November 2026.
  4. American Concrete Institute, ACI Committee 304, ACI 304.2R-17: Guide to Placing Concrete by Pumping Methods (preview), October 2017.

Last checked: 24 November 2026

See how it works

Under two minutes.

Ready to get started?

Start your request

Questions buyers ask

Who sees my request?

Companies that do this specific work, within reach of your site. They see the job and the town. The companies that respond get your name, company, email and phone, so you can deal directly.

What if nobody responds?

Your request reaches companies that do this work within minutes. Each decides for itself whether to respond, so we cannot promise responses. If the work cannot wait, contact your usual suppliers as well.

What does it cost to post a request?

Posting a request is free. A supplier pays one token when it decides your request is worth answering. What you agree about the work is between you and the supplier.

Can I ask for a safety file and insurance?

Yes. Say what your site needs, such as a safety file, proof of insurance or a CIDB grading. Suppliers say in their response whether they can provide it, and you choose who to speak with.

Does Headcore do the work?

No. Headcore is a matching system: it puts your request in front of companies that do this work, and you deal with the supplier directly. Keep your usual suppliers; use Headcore when they cannot help, or when the job is outside what they do.

Do I need a boom pump or a line pump?

It depends on the pour. A truck-mounted boom pump has a vertical and a horizontal reach: one maker's 2019 brochure lists 30.1 m and 26.5 m for a 30 m model and 47 m and 42 m for a 47 m model. A towable pump pushes concrete through a pipeline and an end hose. Describe the pour, how high and how far it must go and where a truck can stand, and let the company say which it would send.

Who may operate a hired concrete pump on a construction site?

Where the pump truck is mobile plant under the Construction Regulations, 2014, regulation 23(1)(d) requires an employer who performs construction work to ensure that its operator is trained, certified competent and authorised in writing, with a medical certificate of fitness. Ask the hire company for those proofs.