Grader hire for gravel roads and sites
Describe the road or yard, how long the work takes and whether you want an operator. Headcore puts your request in front of companies that hire out graders and serve your area, and each decides whether to respond.
Post your job. We make the match.
Free. Takes about 2 minutes.
What details help?
All optional. Mention what you know.
- The machine. TLB, excavator, grader, roller or tipper, and roughly what size, if you know.
- With or without an operator. Whether you need an operator, fuel and transport to site, or the machine on its own.
- How long. Days or weeks, and the date you need it on site.
- The site. The town, access for a truck or lowbed, and the ground conditions.
See an example request
Illustrative, not a real request.
We need to hire a motor grader with an operator for three days to grade and reshape a gravel farm road.
- About 2 km long and 6 m wide, clay gravel, wearing course about 150 mm
- Near Bethal, Mpumalanga, water available from a dam on the farm
Already have an account? Sign in
How Headcore helps with grader hire
Keep your usual hire company in the mix. Headcore helps you find additional companies that can do this work.
- 01
Describe the road and the work
Start in your own words: the length and width, the material, how long and where. You review the request before anything is posted.
- 02
Reach grader companies
Companies that hire out graders and serve your area see the request. Each decides for itself whether to respond.
- 03
Choose who to work with
The companies that can do it respond. Agree the work with the one you choose, and close the request when you have what you need.
Before you hire a grader
The road and the layer
Give the length and width, the material, gravel or clay, and the layer to build. One standard gravel wearing course is 150 mm thick.
Size of grader
One municipal plant hire specification sorts graders by operating mass. Say the class you want, whether it is articulated or rigid and whether it needs a ripper and scarifier.
Water
Layers below the base reach their density relatively easily when compacted at the correct moisture content. Say where water can be drawn on or near site.
Wet or dry, and the operator
A wet rate covers the operator and fuel; on a dry rate you supply the fuel. Say which you want, and whether you need an operator.
Getting it to site
Say where the site is and whether the grader can drive there or needs a lowbed.
In short
Settle the road, the size class and wet or dry hire first. One district municipality's plant hire specification asks for a grader's mass class, whether it is articulated or rigid, with or without a ripper and scarifier, its year of manufacture and a current licence registration certificate. On a construction site the operator must be trained, certified competent, authorised in writing and medically fit.
What decides which grader you need to hire?
Compare responses on what the machine is and what the work is, not on a name. The rows below are what the sources say about each choice, so that your request can name them.[5][8][6][7][3][4]
| What to settle | What the sources say | What to put in the request |
|---|---|---|
| Size class | Cape Winelands District Municipality's plant hire specification, which closed on 19 March 2025, asked for rubber-tyred graders with an operator in mass classes from 5 to 13 tonnes, 13 to 17 tonnes and a heaviest class above that. One maker's 2025 South African guide lists seven models from 15,150 kg with a 3,710 mm blade to 47,990 kg with a 5,490 mm blade. | Say the class you want, or the road width and the work, and ask each response to name the machine. |
| Frame, ripper and scarifier | The same specification wanted each machine offered to state whether the grader is articulated or rigid and fitted with a ripper and scarifier. | Say whether the work needs to rip hard ground, and ask for the answer on each machine. |
| The road | The CSIR guidelines put the thickness of a gravel wearing course at usually a standard 150 mm, and list watering, blading, patch gravelling and cleaning side drains among the routine maintenance of unpaved streets. They name inadequate compaction or low cohesion, combined with traffic, as the normal cause of corrugations on gravel streets. | Give the length, width, material and the state of the road, and the layer thickness if you are building one. |
| Water | The CSIR guidelines note that densities below base level are relatively easily achieved if compaction is carried out at the correct moisture content. | Say where water can be drawn on or near site, and whether you want a water cart as well. |
| Wet or dry | The Cape Winelands specification paid wet rates, covering fuel, operator, plant and maintenance. Setsoto's 2026/27 tariff includes the driver for its grader, and Siyancuma's hires plant dry: the machine goes out with a full tank and must come back with one. | Say whether you want an operator and who supplies the fuel. |
| Year and licence | The Cape Winelands specification asked each machine's year of manufacture and accepted graders only with a current licence registration certificate. | Ask each response for the machine's year of manufacture and its licence registration certificate. |
Who may operate a grader on site?
Building or maintaining a road, and moving earth, is construction work under regulation 1 of the Construction Regulations, 2014, and a grader used for it is mobile plant: machinery "able to move independently". Regulation 23(1)(d) requires the operator to have "received appropriate training", be "certified competent and in possession of proof of competency" and be authorised in writing. The operator also needs a medical certificate of fitness from an occupational health practitioner in the form of Annexure 3.[1]
Regulation 23(1)(k) requires the operator to inspect the machine daily against a checklist and record the findings in a register kept in it. On a public road, regulation 23(2)(j) requires the machine to comply with the National Road Traffic Act, 1996.[1]
On a mine, a self-propelled grader used for mining, transport or associated operations is a trackless mobile machine under regulation 8.10 of the Mine Health and Safety Regulations (GN R. 125 of 2015). The employer must take reasonably practicable measures to ensure that operators are assessed as competent, authorised in writing by the responsible engineer and their supervisor, and issued a licence (8.10.23), and that a pre-use checklist is completed at the beginning of every shift (8.10.24.2); the operator must carry the licence while operating (8.10.27). Regulations 8.10.23 and 8.10.27 do not apply to a machine licensed under what the regulation calls the "National Road Transportation Act 2000" and not used for primary mining activities (8.10.28).[2]
What should a grader hire request include?
Responses are usually easier to compare when the request gives the road, the machine and the terms, so that the supplier can name a grader instead of asking back. Include:
- The road or yard: length and width, the layers to build (for example a 150 mm gravel wearing course) and the material.[7]
- The machine: mass class, articulated or rigid, with or without a ripper and scarifier.[5]
- Wet or dry hire: whether the hire covers the operator and fuel, the minimum hours and standby.[3][4][5]
- Transport to site as its own line: from where, and whether the grader drives or rides on a lowbed.[5]
- Where water can be drawn on or near site.[6][5]
- Each machine's year of manufacture and current licence registration certificate.[5]
- The operator's proof of competency, written authorisation and Annexure 3 medical certificate, and the daily checklist register.[1]
- Dates and length: the day it is needed and how long.
Sources
- Department of Labour (Government Gazette 37305), Construction Regulations, 2014 (GN R.84), 7 February 2014.
- Department of Mineral Resources (Government Gazette 38493), Mine Health and Safety Act, 1996: Regulations relating to machinery and equipment (GN R. 125), regulation 8.10 Trackless mobile machinery, 27 February 2015.
- Setsoto Local Municipality, Tariffs 2026/2027 (sundry tariffs: hire of grader), Applicable from 1 July 2026.
- Siyancuma Local Municipality, Tariffs for the 2026/2027 financial year (rental rates for vehicles and equipment), 2026/27 financial year.
- Cape Winelands District Municipality, Tender T 2025/015: the hiring of mechanical and construction plant equipment for the period ending 30 June 2028 (specification and pricing schedules), Closing date 19 March 2025.
- CSIR (for the Department of Housing), Guidelines for Human Settlement Planning and Design, Volume 2, Chapter 8: Roads: materials and construction, PDF of 22 October 2009.
- CSIR (for the Department of Housing), Guidelines for Human Settlement Planning and Design, Volume 2, Chapter 8: Roads: materials and construction (unpaved streets), PDF of 22 October 2009.
- Komatsu South Africa (Pty) Ltd, Product guide, Southern Africa (motor graders), September 2025.
Last checked: 24 November 2026
How Headcore works
- Posting a request is free.
- Your request goes to companies that do the kind of work you describe.
- A supplier answers with a response that says how they would do the job. You choose who to work with.
Questions buyers ask
What does it cost to post a request?
Posting a request is free. A supplier pays one token when it decides your request is worth answering. What you agree about the work is between you and the supplier.
Who sees my request?
Companies that do this specific work, within reach of your site. They see the job and the town. The companies that respond get your name, company, email and phone, so you can deal directly.
What if nobody responds?
Your request reaches companies that do this work within minutes. Each decides for itself whether to respond, so we cannot promise responses. If the work cannot wait, contact your usual suppliers as well.
Who brings the machine to site?
Say in your request whether you need it delivered. Many hire companies bring a machine on a lowbed or drive it to site, and some charge for that separately. Suppliers say in their response how they would do it.
Does Headcore hire out equipment?
No. Headcore is a matching system: it puts your request in front of companies that do this work, and you deal with the supplier directly. Keep your usual suppliers; use Headcore when they cannot help, or when the job is outside what they do.
What is the difference between wet and dry grader hire?
A wet rate includes the operator and fuel; on a dry rate the hirer supplies the fuel. Setsoto's 2026/27 tariff includes the driver in its grader hire, and Siyancuma's 2026/27 tariff hires plant dry, with a full tank out and a full tank back. Say in your request which you want, and whether you need an operator.
Does a grader operator need a licence in South Africa?
On a construction site, regulation 23(1)(d) of the Construction Regulations, 2014 asks for training, proof of competency, written authorisation and a medical certificate of fitness. On a mine, regulation 8.10.23 of the Mine Health and Safety Regulations requires the employer to ensure assessment, written authorisation and a licence, which the operator must carry (8.10.27), unless the grader is licensed for the road and not used for primary mining activities (8.10.28). Say in your request where the grader works.
Start with what you know.
A sentence or two is enough. Nothing reaches suppliers until you confirm it.
Start your request